Laserfiche WebLink
STATE HIGHWAY 139). THE REQUEST WILL INDICATE THE SURFACE OWNER'S <br />CONCURRENCE WITH THE PLAN FOR ROAD RETENTION PRESENTED IN PERMIT <br />SECTION 3.3.1. ALTERNATIVELY, A REVISED RECLAMATION PLAN FOR THE LOWER <br />ROAD SEGMENT DEMONSTRATING COMPLIANCE WITH RULE 4.03.1(7)(a)(i) through (ix) <br />WILL BE SUBMITTED TO THE DIVISION. <br />STIPULATION NO. 34 <br />WITHIN 30 DAYS OF ISSUANCE OF THE RN-05 PROPOSED DECISION AND PRIOR TO <br />ISSUANCE OF THE RN-05 RENEWAL PERMIT, THE OPERATOR WILL SUBMIT AN <br />ACCEPTABLE REPLACEMENT RECLAMATION POND OR RIDER TO THE EXISTING <br />SURETY BOND, TO BRING THE TOTAL BOND AMOUNT HELD BY THE DIVISION TO AT <br />LEAST $263,445.00. <br />3