Laserfiche WebLink
MIDI <br /> ENT OFT U. S. DEPT. OF THE INTERIOR ���"T°FTy�� <br /> �QP� <br /> OFFICE OF SURFACE MI I�� <br /> Mine Site Evaluation <br /> SEC <br /> <c State Program oEc o` 2ooa F°F SU <br /> '�.h 3 19�'9 RFA <br /> 1. Permittee/Person 9. Permit Num vis►ori ui Keclam l 0. Permit Type <br /> OAKRIDGE ENERGY,INC. C-080-92 Minn PP <br /> 2.Address IL. Field Visit Date 12. Purpose 13. SRA Present <br /> 4613 JACKSBORO HWY. 10/29/2008 O� Y❑ <br /> 3. City 4. State mm-dd -yyyy <br /> 14. Permit Status 15. Site Status 16. Facility Type <br /> Wichita Falls TX <br /> BR P2 AD <br /> 5. Zip Code 6. Phone Number <br /> 17. OSM Office# 18. CC_ID# 19. Land Code <br /> 76302 (940)322-4772 <br /> 140 S <br /> 7. Operator Name,if Different than Permittee <br /> 20. M.S.H.A ID# 21. State Abrev. 22. County Name <br /> OAKRIDGE ENERGY,INC., <br /> CO LA PLATA <br /> 8. Mine Name <br /> 23. AVS Permittee Entity ID Number 24. State Office <br /> CARBON JUNCTION MINE <br /> 123708 <br /> 25. Hours 26. Si ature Block 27. Reviewing Official: <br /> 4.0 a. Permit Review <br /> Si� a e: Signature: <br /> 4.0 b. Site Visit Time <br /> HENRY AUSTIN ID#116 <br /> 16.0 c. Travel Time Printed Name: Review Date: <br /> mm-dd-yyyy <br /> E:2 0 d. Report Writing Date: 11/17/2008 Is Supplemental MSE Page Used Y/N Y❑ <br /> Permit Type -Item 10 IP=Interim Program, PP=Permanent Program, NP=No Permit <br /> Purpose Type Codes Item 12 CCR....Citizen Complaint Referral(non site visit) <br /> Oxx....Oversight RFx.... Reclamation Fees CC......Citizen Complaint(initial site visit) <br /> Axx....Assistance Fxx.....Federal Actions CCF....Citizen Complaint Follow-up <br /> Joint Inspection-Item 13 A joint inspection is when a state inspector accompanies an OSM inspector any time during the review of the mine site. <br /> Permit Status-Item 14 AB....Abandoned:All surface and underground coal mining activities have ceased and <br /> operator has left the site without completing reclamation as defined in <br /> A.... Active:Coal mining and reclamation activities occurring or 30 CFR 840.11(g) <br /> ppermitted but not yet disturbed. AB1..Bond Forfeiture: Bond forfeiture officially in processor completed,and. <br /> IN....Inactive(Permanent Program Permit): Phase II completed or reclamation in progress or not yet commenced. <br /> Temporary Cessation of Operations. (Interim Program Permit) AB2..Partially Reclaimed Forfeiture: Forfeited site where all bonds have been <br /> Coal mining completed and reclamation activities initiated. used to reclaim site,but site not reclaimed to Program standards. <br /> BR...Bond Release:Reclamation completed and State Regulatory AB3..Reclaimed Forfeiture: Forfeited site that has been reclaimed to Program standards. <br /> Authority(RA)has released all of the bond(Phase III Release.) NA...Not Applicable:When site is unpermitted. <br /> Site Status Codes-Item 15 NS..Non-Site Visit:Status of site7notdetermined.ND...No Disturbance: No coal mining and reclamation MC..Mining Complete:No mining activity on site, FP..Forfeiture Pending:The RAng <br /> operations have been started. site regraded and awaiting phase bond release. actions to revoke the permitthe <br /> EX..Coal Exploration:Coal exploration operations TC..Temporary Cessation:The RA has granted performance bond(s),and/orrecama- <br /> have started and where coal mining operations cessation of mining pursuant to 30 CFR 816/ tion of forfeited site is in progress. <br /> have not begun. 817.131(b). FR..Forfeited and Reclaimed:Forfeiture <br /> AP..Active Coal Producing:Coal surface mining P1...Phase I Release: At least Phase I bond release reclamation completed. <br /> activities are occurring. granted for entire permitted area. For interim FO..Abandoned Site:Abandoned site that <br /> AN..Active Non-Producing:Active non-producing permits,partial bond release. is permitted but there is no bond. <br /> facility such as tipple or Preparation plant P2..Phase II Release: At least Phase 11 bond releaseWC.Wildcat:Coal mining and reclamation <br /> NM..No Mining: The Permit Status is active,site is for the entire permitted area. operations have or are taking place and <br /> not in Temporary Cessation, no surface coal P3..Phase III Release: Reclamation completed and the activity is not covered by the <br /> mining activity,and site not regraded. the RA has released all bond. required permits from the RA. <br /> Facility Type Codes-Item 16 D...Ancillary(Haulroad,Conveyor,and/or Rails) H...Exploration Permits L...Remining site permitted <br /> A... Surface E...Refuse and/or Impoundment I...Notice of Intent to Explore under 30 CFR785.25 <br /> B... Underground F...Loadingg Facility and/or Tipple J...Exempt 16 and 2/3 <br /> C... Preparation Plant G...Stockpiles K...Government Financed Construction Exemption <br /> Small Business Regulatory Enforcement Fairness Act (SBREFA) <br /> Your Comments Are Important <br /> The Small Business and Agriculture Regulatory Enforcement Ombudsman and 10 Regional Fairness Boards were established to receive comments from <br /> small businesses about Federal agency enforcement actions. The Ombudsman will annually evaluate the enforcement activities and rate each aeenc 's <br /> responsiveness to small business. If you are a small business(a business with 500 or fewer employees including those of affiliates) Page 1 of_ <br /> and wish to comment on the enforcement or compliance activities of OSM,call 1-888-REG-FAIR(1-888-734-3247). Revised December 4,1999 <br />