My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-12-15_REPORT - C1981038
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981038
>
2008-12-15_REPORT - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:38:57 PM
Creation date
12/16/2008 9:25:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
REPORT
Doc Date
12/15/2008
Doc Name
4th Quarter Wastebank Inspection
From
J.E. Stover & Associates, Inc
To
DRMS
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
MLT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
j. <br />BOWIE RESOURCES, LLC <br />Bowie No. 1 Mine <br />Coal Mine Waste Bank Inspection - 4th Quarter 2008 <br />FINAL INSPECTION <br />On December 10, 2008, 1 performed the FINAL INSPECTION of the Bowie No. 1 Mine <br />coal mine waste bank in accordance with Rule 4.10.2(2)(a). This rule states that <br />inspections may terminate when the coal mine waste bank has been graded, covered in <br />accordance with 4.10.4(4), topsoil has been distributed on the bank in accordance with <br />4.06.4, and revegetated. <br />I, J. E. Stover, P.E., have a wide variety of experience in the design and construction of <br />- - - earth-fill emban-kments. -Nothing-was obs€r-ved-during. the_inspection_that w-oul.d,indicate _ <br />the pile has a potential for failure. The gob disposal area was dry. The pile has been <br />covered with 4.0 feet of non-toxic cover, seeded and mulched. <br />The design of the waste disposal area is presented in Volume 6A. To the best of my <br />knowledge and belief, based on my inspection of the pile and previous inspections by <br />professional engineers, the coal mine waste bank has been constructed in accordance <br />with the approved plan. <br />The pile is located in a remote area well away from human habitation. A failure of the <br />pile might damage the mine haul road located below the pile. However, a failure of the <br />pile would probably not be a hazard to human life. 10 ?C7. <br />'? 011 <br />Recommend maintenance: None ®?®o?S L SLOG;:®o <br />0 <br />Qs®o / ?!? O 8 0 ? ? <br />James E° Over Date <br />P.E. No. 19 0®??° 0 <br />00 0 aQ po
The URL can be used to link to this page
Your browser does not support the video tag.