My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-12-04_REVISION - M1983175
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983175
>
2008-12-04_REVISION - M1983175
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:45:26 AM
Creation date
12/15/2008 3:05:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983175
IBM Index Class Name
Revision
Doc Date
12/4/2008
Doc Name
Cost summary form
From
DRMS
To
Alomosa Pit No. 2
Type & Sequence
SI3
Email Name
KAP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCTION sheet 2 of 2 <br />Haulinq Capacity : <br />Scraper Payload (weight) Basis : Scraper Bowl (volume) Basis : <br />Material weight : 1,600 pounds/LCY <br />Material description <br />Top Soil <br />Rated payload : 48,000 pounds <br />Payload capacity : 30.00 LCY <br />Cycle Time : <br />Scraper loading time * : 0.90 <br />Maneuver and spread time : 0.60 <br />* load time per scraper pair on push-pull models <br />Struck volume : 15.70 LCY <br />Heaped volume : 21.00 LCY <br />Average volume : 18.35 LCY <br />Adjusted capacity : 18.35 LCY *** <br />hourly production reflects volume per scraper pair on push-pull models <br /> Job Condition Corrections : Site altitude (ft.) : 7,500 <br /> Scraper Push dozer Source <br />minutes Altitude adj.: 1.000 NA (Cat HB) <br />minutes Job efficiency : 0.830 NA (Cat HB) <br /> Net correction : 0.830 NA <br />Travel time <br />Road condition description : Rutted dirt, little maintenance, no water, 2" tire penetration <br />Haul Route : <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)** <br />1 500 0.00 5.00 5.00 2218 0.36 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Haul time : 0.36 minutes <br />Return route : <br />** travel time for each segment is adjusted for acceleration/deceleration. Return time : 0.33 minutes <br />table velocities are max. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : 2.20 minutes <br />Unadjusted unit production/hour : 1,003.04 LCY/hour *** Adjusted for job conditions : 832.52 LCY/hour <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers : 2 scraper(s) <br />Adjusted single scraper team (unit) hourly production : 832.52 LCY/hour <br />Adjusted multiple scraper team (fleet) hourly production : 832.52 LCY/hour <br /> <br />...... _... .... <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job time : 38.76 Hours <br />Unit cost : $0.781 /LCY Total job cost : $25,192 <br />77
The URL can be used to link to this page
Your browser does not support the video tag.