Laserfiche WebLink
User <br />KAP <br />Site: Alamosa Pit No. @ Filename :M175-004 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shiftbasis : 1 per day <br />Attachment no. 2:3-shank ripper <br />MATERIAL QUANTITIES <br />Selected estimating method : Area <br />Alternate methods - <br />seismic : NA NA Load factor : NA Bank volume : NA BCY <br />Area : 19.00 acres Rip depth (ft) : 1.00 Volume : 30,653 BCY or CCY <br /> <br />Source of estimated quantity : Reclamation map <br />Source of estimated load factor : NA <br /> <br />HOURLY PRODUCTION <br />Alternate methods - Job Condition Correction Factors - <br />Seismic : Seismic velocity : NA feet/second Unadjusted production <br />Unadjusted production : NA cu. yds./hour per selected method : 1,436.70 cu. yds./hour <br /> <br />Area : Avg. ripping depth : 1.00 feet/pass Site altitude : 7,500 feet <br />Average ripping width : 7.67 feet/pass Altitude adjustment : 1.00 (Cat HB) <br />Average ripping length : 500.00 feet/pass Job efficiency factor : 0.83 (1 shift/day) <br />Average dozer speed : 88.00 feet/minute Net job correction : 0.83 multiplier <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.891 acres/hour Adjusted unit production : 1,192.46 cu. yds./hour <br />Unadjusted production : 1,436.70 cu. yds./hour Adjusted fleet production : 1,192.46 cu. yds./hour <br /> <br />... <br />JOB TIME AND COST <br />Fleet size : 1 dozer(s) Total job time : 25.71 hours <br />Unit cost : $0.180 per cu. yd. Total job cost : $5,505 <br />