Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name: DRMS <br />Task # : 002 State :Colorado Permit/job #:M-1994-108 <br />Date : 1210912008 County :Montezuma Abbreviation :none <br />User: WHE Site : Cedar Point Pit Filename : M108-002 <br />Permit or other job action :Routine Bond Update <br />Task description :Highwall Reduction from 1H.-IV to 3H. IV, assume 1,000' long highwail <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />(Equipment Description <br />Cost Br( <br />Scraper work team -Scraper : Cat 633E Series 2 (2001) <br />-Push dozer:NA <br />Support equipment -Load area : Cat D8R Series 11 - 8U (2005) <br />-Dump area : Cat D8R Series 11 - 8U (2005) <br />Road maintenance -Motor grader : NA <br />-Water truck : NA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA dozer dozer . NA NA <br />% Utilization-machine : 100 NA 50 50 NA NA <br />-Ripper attachment : NA NA 0 0 NA NA <br />Ownerhip cost/hour : $80.67 NA $50.59 $50.59 NA NA <br />Operating cost/hour : $117.98 NA $38.11 $38.71 NA NA <br />Ripper op. cost/hour : NA NA $0.00 $0.00 NA NA <br />Operator cost/hour : $24.95 NA $32.78 $32.78 NA NA <br />Unit subtotals : $223.59 NA $122.08 $122.08 NA NA <br />Number of units : 2 0 1 1 0 0 <br />Group subtotals : Work : $447.18 Support : $244.16 Maintenance : $0.00 <br />MATERIAL QUANTITIES <br />Initial <br />volume : 14,864 <br />Total work team cost/hour <br />Swell Loose <br />LCY factor : NA volume <br />$691.35 <br />14,864 LCY <br />Source of quantity take-off :See attached drawing, "Highwall Reduction" <br />Source of estimated swell factor :NA