Laserfiche WebLink
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />PROJECT IDENTIFICATION sheet 1 of 2 <br />Agency or organization name: DRMS <br />Task # : 05a State : Colorado Permit/job # : M-1997-098 <br />Date : 02/29/2008 County :Moffat Abbreviation :none <br />User : THM Site: Flag Creek Quarry Filename :M098-05a <br />Permit or other job action :Final Reclamation Cost Update <br />Task description :Initial mobilization to quarry <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br />Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />NUN-KUAUA0LC c!dU1rmc+ <br />Machine <br />Description <br />-Cat D8R Series II - 8SU (20 <br />-CAT 966G (2002) <br />-Reveg Tractor 'V i <br />Weight/unit <br />(Tons) <br />52.55 <br />25.10 <br />10.00 <br />Ownership <br />Cost/hr/unit <br />$50.32 <br />$29.49 <br />$20.00 <br />Haul Rig <br />Cost/hr/unit <br />$125.45 <br />$117.55 <br />$88.67 <br />Fleet Size <br />(No. units) <br />1 <br />1 <br />1 <br />Haul Trip <br />Cost/hr/fleet <br />$175.77 <br />$147.04 <br />$108.67 <br />Return Trip <br />Cost/hr/fleet <br />$125.45 <br />$117.55 <br />$88.67 <br />DOT permit <br />Cost/fleet <br />$0.00 <br />$0.00 <br />$0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $431.48 $331.67 $0.00