My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-29_REVISION - M1997098
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1997098
>
2008-02-29_REVISION - M1997098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:17 AM
Creation date
12/12/2008 1:55:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997098
IBM Index Class Name
REVISION
Doc Date
2/29/2008
Doc Name
Cost updates & surety increase
From
DRMS
To
Flat Top Flagstone, LLC
Type & Sequence
SI1
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- -- -- -- h t2of2 <br /> <br />ADJUSTED COSTS - <br />Ownership Costs -- -- - <br />Over <br />haul and Opera <br />ting Costs see <br /> Over haul Field R epair <br /> tion <br />i <br />D CFC Overhead Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br /> eprec <br />a NA NA NA NA <br />Acquisition cost : $18.35 NA NA NA NA NA NA NA <br />life -Dozer and ROPS : <br />Econ $18.35 NA NA $7.24 $13.57 $8.05 $13.09 NA NA NA NA <br />. NA NA NA $1.21 $1.35 $2.21 $1.36 NA NA NA <br />-Attachment no. 2 : NA NA NA NA <br />Annual usage : $27.68 $12.39 $17.35 NA NA NA NA NA <br />Double shifts : $20.76 $6.19 $8.67 NA NA NA NA NA NA NA <br />Triple shifts : $18.46 $4.12 $5.78 NA NA NA NA NA NA NA NA <br />NA <br />Mechanic labor-Dozer and ROPS : NA NA <br />NA <br />$5.65 <br />NA <br />$6.28 <br />NA <br />NA <br />NA <br />NA <br />Attachment no. 2 : NA NA NA $0.94 NA $1.72 NA NA NA NA NA <br />Fuel/lube -Dozer and ROPS : NA NA NA NA NA NA NA $30.56 $5.97 $0.00 $2.01 <br /> NA NA NA NA NA NA $0.00 $0.35 $0.00 $1.13 <br />Attachment no. 2 : NA <br /> <br /> Overhaul and Operating Costs <br />ADJUSTED COST SUBTOTALS Ownership Costs <br /> Ove rhaul Field Repair <br /> Depreciation CFC Overhead Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br />Dozer, ROPS and Attachment no. 2: Dozer and ROPS <br />57 <br />65 $13 <br />$5 <br />28 <br />$6 <br />$13.09 <br />$30.56 <br />$5.97 <br />$0.00 <br />$2.01 <br />Single shifts : $27.68 $12.39 917.35 . . . <br />Double shifts : $20.76 $6.19 $8.67 <br />78 Ripper : <br />94 <br />$0 <br />$1 <br />35 <br />$1.72 <br />$1.36 <br />$0.00 <br />$0.35 <br />$0.00 <br />$1.13 <br />Triple shifts : $18.46 $4.12 $5. . . <br />HOURLY OPERATOR WAGES Base Fringe F.I.C.A. Unempl. <br />2 Wk.Comp. <br />80% <br />9 Total <br />($/hr) <br />Shift Differential <br />Colorado labor zone <br />: 2 <br /> Rate Benefits 7.65% 6. <br />0% . <br />Dozer operator (< 70hp) $20.67 $7.22 $1.58 $1.28 $2.03 $32.78 Day : $0.00 Two shift per day average : $0.15 <br /> 67 <br />$20 $7 <br />22 $1.58 $1.28 $2.03 $32.78 Swing : $0.30 Three shift per day average : $0.25 <br />Dozer operator (>=70hp . . 60 <br />$1 30 <br />$1 06 <br />$2 $33.15 Night : $0.45 <br />Mechani $20.97 $7.22 . . . <br /> <br />HOURLY EQUIPMENT COST SUMMARY Ownership Operating and Overh aul Operator Total <br /> Machine Attachments Cost/hr ($) <br /> Single shifts : $57.41 $77.13 $6.86 $32.78 $174.18 <br /> <br />Double shifts <br />E <br />: <br />$35.63 <br />$77.13 <br />$6.86 <br />$32.93 <br />$152.54 <br /> Triple shifts : $28.36 $77.13 $6.86 $33.03 $145.38 <br /> <br />EQUIPMENT SPECIFICATIONS <br />n <br />i <br />i <br />T <br />Weight <br />Length <br />Width <br />Height <br />Fuel <br />Horsepower <br />BULLDOZER : ss <br />o <br />ransm ft ) <br />(ft ) <br />(ft type (gyp) <br />i <br />i Type (UST) .) <br />( . . <br />pt <br />on <br />Descr <br />8SU (2005) <br />11 <br />i <br />NA <br />41.8 <br />22.7 <br />8.7 <br />11.5 diesel 310 <br />- <br />es <br />Cat D8R Ser Travel speeds (m ph) <br /> Weight Capacity Width Height Gear: 1st 2nd 3rd <br />BLADE: (UST) (cy) (ft.) (ft.) Forward : 2.2 3.9 6.7 <br />Description 5.4 11.4 12.9 5.5 Reverse : 2.9 5.0 8.6 <br />Semi-Universal Weight No. of Shank Beam Max. rip <br />REAR RIPPER : (UST) shanks spacing (ft ) width (ft) depth (ft) <br />Description Type <br />4 <br />5 <br />3 <br />3.6 <br />7.1 <br />2.6 <br />3-shank ripper Adj. Parallelogram . <br /> Total machine shipping weight : 52.5 US tons
The URL can be used to link to this page
Your browser does not support the video tag.