Laserfiche WebLink
December 10, 2008 <br />Technical Revision Narrative <br />Kiowa County Road & Bridge will import 200 cubic yards of topsoil to replace what has been removed. <br />The topsoil stockpile that is currently on site is 4100 cubic yards. <br />No other topsoil will be imported unless needed to complete the 9 -12 inches of topsoil to cover the <br />affected area. There is topsoil on the remaining pit site that has not been disturbed and can be used for <br />another time. Approximately 2/3 of the pit has been reclaimed in 1994, therefore it will not need more <br />topsoil covering. That portion that has been reclaimed will be reseeded and mowed to control the <br />weeds. The seed mixture of blue grama, sideoats grama and little bluestem, which is to be used for the <br />permanent reclamation, will be used for topsoil stabilization on the current stockpile and any other pile <br />that is imported or created in the future. This procedure will be accomplished by December 28, 2008. <br />? 4 d' - ?/?-' 0' <br />Rick Spady