Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name: DRMS <br />04a State : Colorado <br />0211312008 County : Mesa <br />THM Site :Hall Pit <br />Permit or other job action : Reclamation Cost Update <br />Task description : Haul topsoil from Ford Pit to pad and slope areas of Hall Pit <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />ment Description <br />Scraper work team -Scraper <br />-Push dozer <br />623G <br />Support equipment -Load area : NA <br />-Dump area : NA <br />Road maintenance -Motor grader : NA <br />-Water truck : NA <br />Cost Bre <br />akdown : Scraper Work Team Support Eq uipment Road Maintenance Equipment <br /> Scraper Dozer Load area Dump area Grader Water truck <br /> NA NA <br />Import data filename : scraper2 NA NA NA <br />% Utilization-machine : 100 NA NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $75.32 NA NA NA NA NA <br />Operating cost/hour : $106.63 NA NA NA NA NA_ <br />cost/hour : <br />er op <br />Ri NA NA NA NA NA _ NA <br />. <br />pp <br />Operator cost/hour : $32.96 NA NA NA NA NA <br />Unit subtotals : $214.91 NA NA NA NA NA <br />Number of units : 2 0 0 0 0 0 <br />Group subtotals : Work : $429.82 Support : $0.00 Maintenance : $0.00 <br />Total work team cost/hour : $429.82 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 1,613 CCY factor : 1.125 volume : 1,815 LCY <br />Source of quantity take-off :1.5acre x 9" avg. depth <br />Source of estimated swell factor :n/a <br />Permit/job # :M-1983-142 <br />Abbreviation :none <br />Filename :M142-04a <br />includes swell)