Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Scraper work team -Scraper <br />-Push dozer <br />Cost Bre <br />Agency or organization name: DRMS <br />01a State : Colorado <br />02/11/2008 County :Mesa <br />THM Site :Hall Pit <br />Permit or other job action :Reclamation Cost Update <br />Task description : Haul overburden from Ford Pit to disturbed area of Hall Pit <br />Support equipment -Load area <br />-Dump area <br />Equipment Description <br />Cat 623G <br />NA <br />NA <br />NA <br />Road maintenance -Motor grader: <br />-Water truck :NA <br />akdown : Scraper Work Team Support Eq <br />Load area uipment <br />Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : <br />% Utilization-machine : Iq T NA <br />NA NA <br />NA NA <br />NA NA <br />NA <br />-Ripper attachment : <br />Ownerhip cost/hour : <br />$75.32 <br />NA NA <br />NA NA <br />NA NA <br />NA NA <br />NA <br />Operating cost/hour : $106.63 NA NA NA NA NA <br />Ripper op. cost/hour : NA NA NA NA NA NA <br />Operator cost/hour : $32.96 NA NA NA NA NA <br />Unit subtotals : $214.91 NA NA NA NA NA - <br />Number of units : 2 0 0 0 0 0 <br />Group subtotals : Work : $429.82 Support: $0.00 Maintenance : $0.00 <br />Total work team cost/hour : $429.82 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 12,100 CCY factor : 1.165 volume : 14,096 LCY <br />Source of quantity take-off : Reclamation plan: Replace 5' of overburden over shale <br />Source of estimated swell factor : N/A <br />Permit/job #: M-1983-142 <br />Abbreviation :none <br />Filename :M142-01a