Laserfiche WebLink
sheet 2 of 2 <br />ur??T <br />RV/1Vf1V LL VYwn . <br />Machine <br />Description <br />-Flatbed Truck, 6x4, 45K GVW <br />-Light Duty Pickup, 4x4, 314 T <br />Total <br />Cost/hour/unit <br />$65.04 <br />$33.47 <br />Fleet Size <br />(No. units) <br />1 <br />1 <br />Haul Trip <br />Cost/hr/fleet <br />$65.04 <br />$33.47 <br />Return Trip <br />Cost/hr/fleet <br />$65.04 <br />$33.47 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $98.51 $98.51 <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region : Grand Junction <br />Transportation Cycle Time : Non- Total one-way travel distance : 5.0 miles <br />Pnnrinhla I Rnadable Average travel speed :. 45.0 mph <br />Haul time (hours) _ - O.11 0.11 Total non-roadable mob/demob cost" : $1,565.10 <br />Return time (hours) = 0.11 0.11 ' two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost'`" : $21.89 <br />Unloading time (hours) = 0.50 NA " one round trip, no haul rig <br />Subtotals = 1.22 0.22 <br /> <br /> Total job time : 2.44 hours <br />JOB TIME AND COST Total job cost : $1,587