Laserfiche WebLink
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Dq wvnwd d NWWW Reimm <br />1311 Shwffm St, Room 215 <br />Dw+*w, Coimado 60203 COLORADO <br />Pmm(303) ?3567 01v1j1oN or <br />RICLAMATION <br />FAX- (303) $324106 MINING <br /> SAF?TY <br />PERFURMANCF, WARRgNTy <br /> 811 ftw1 k. <br />c WWW <br /> Herb D. 9wel n <br /> Ezecud" Director <br />Operator nandd w. com w <br />Uh " <br />Do - <br /> w <br />NaMW Rwowce Tnww <br />Operation: <br />Permit No: <br />This form has been approved by the Mined Land Reclamaden Boardpursuant to sections 34-32--117, C.RS, <br />of the Mined Land Reclamadon Act and 34-32.5--117, CJU, of the Colorado Land Reclamation Act for the <br />F-kh acdon of Construction Materials, Any alteration or nrodi, kadon of this form, without approval by the <br />Board shall result in the financial warranty being invalid and result in the voiding of any permit issued iw <br />conjuncdon with such invalid flWancial warranty and sub, jest the operator to cease and desist orders and civil <br />penalties for operating without a permit pursuant to seedons 34-32--123, C.Jt&, of the Mined Land <br />Reclamation Act and 34-325--113, CUES., of the Colorado Land Reclamation Act for the Extraction of <br />Construction Materials. <br />KNOW ALL MEN BY THESE PRESENTS, THAT: <br />WHEREAS, the Colorado Mined Land Reclamation Act, C.R.S. 3432-101 gt M. (the "Act'), as <br />amended, and the Colorado Land Reclamation Act for the Extraction of Construction Materials, <br />C.R.S. 3432.5-101 et sue. (the "Act's, as amended, provides that no <br />Permit maybe issued under the Act until the <br />Mined Land Reclamation Board (the "Board") receives a performance warranty (or warranties) that is a written <br />promise to comply with all applicable requirements of the Act. <br />conduct a mining operation known as (? " or"), has applied fora permit to <br />lands in (the Operation") on certain <br />County, Colorado. These lands are described in the permit application, as <br />amended and supplemented, and are referred to herein as the "Affected Lands". <br />WHEREAS, in its application for the permit, the Operator has agreed to be bound b all <br />the Act and all applicable rules and relations of the Bo y requirements of <br />Su ard, as amended from time to time. <br />WHEREAS, the Board has determined, in accordance with the Act, that the estimated costs of <br />reclamation with regard to those affected lands in <br />sub'ect to the County which are now or nay become <br />1 permit are those amounts for the stated periods of time as set forth in the financial warranty, which <br />may be amended from time to time to reflect revised estimates of said costs of reclaration. <br />Office of <br />nlH__ .L