Laserfiche WebLink
CIRCES Cost EstimatingSoftware <br />DEMOLITION WORK <br />PROJECT IDENTIFICATION Agency or organization name: DRMS <br />Task # : 01a State : Colorado PermiUjob# : M-1980-085 <br />Date : 08-Feb-2008 County :Pitkin Abbreviation :none <br />_ <br />User : SSS Site : Vagneur Site Filename : M085-01a <br />Permitting action :Amendment No. 2 <br />Task description : Structural demolition and disposal <br />UNIT COSTS Last unit cost update : May, 2007 Location adjustment : 92.32% <br />STRUCTURE or ITEM DESCRIPTION DIMENSIONS DEMOLITION MENU SELECTION QUANTITY UNIT UNIT COST TOTAL COST <br />-Concrete plant 50'x 140'x 20' Demo./disp./existing pit - 1OK' haul 140, 000.00 CF $0.1982 $27,749.65 <br />-Concrete plant foundation 50'x 140' Demo./disp. exs. pit, 8" th.- IOK ft. 8.700.00 SF $2.2762 $19,802.70 <br />-Office area 50'x 175'x 10' Demo./disp./existing pit - 10K' haul 87,500.00 CF $0.1982 $17,343.53 <br />-Office area slab 175'x 50' Demo./disp. exs. pit, 6" th.- IOK ft. 8,700.00 SF $1.7071 $14,852.02 <br />-Truck scale 150'x 20' Demo./disp. exs. pit, 1'x2' - 10K ft. 340.00 LF $6.8285 $2,321.70 <br />-Fuel containment walls 60'x 25'x 5' DemoAdisp. exs. pit, 8" th.- 10K ft. 850.00 SF $2.5025 $2,127.15 _ <br />-Fuel containment slab 60'x 25' Demo./disp. exs. pit, 6" th.- 10K ft. 1,500.00 SF $1.7071 $2,560.69 <br />-Canvas bldg w/ steel frame 60'x 35'x avg 10' Demo./disp./existing pit - IOK' haul 21, 000.00 CF $0.1982 $4,162.45 _ <br />-Canvas bldg asphalt slab 60'x 35'x 3" Pavement, bitum. - 3" th. 233.00 SY $3.2000 $745.60 <br />-Load and haul above pad asphalt to pit 60'x 35'x 3" Load/haul/dump rubble-to 1, 000 R. 58.00 CY $0.7450 $43.21 <br />-unprocessed recycled aspha/Uconcrete 15000 cy max Push rubble into pit - to 200 ft. 15,000.00 CY $1.0530 $15,795.00 <br />-Shop structure 60'x 50'x 20' Demo./disp./existing pit - 1OK' haul 60,000.00 CF $0.1982 $11,892.71 <br />-Shop pad 60'x 50' Demo./disp. exs. pit, 8" th.- 10K ft. 3,000.00 SF $2.2762 $6,828.52 <br />-Concrete truck washout pit 40'x 15' Demo./disp. exs. pit, 6" th.- 10K ft. 600.00 SF $1.8769 $1,126.14 <br />-powerlines 3000' Power/phone line - single pole 3,000.00 LF $2.5400 $7,620.00 <br />-septic tank pump and backfill 25,000 cf total pump and backfill 25,000.00 CF $0.2500 $6,250.00 <br />-5,900 gal diesel tank 5,900 gal Haul to cert. dump - 6K- 8K gal. 1.00 EA $780.0000 $780.00 <br />-10,000 gal diesel tanks 10, 000 gal Haul to cert. dump - 9K-12K gal. 2.00 EA $1,050.0000 $2,100.00 <br />-4,000 gal gasoline tank 4,000 gal Haul to cert. dump - 3K- 5K gal. 1.00 EA $660.0000 $660.00 <br />-55 gal oil drums 55 gal Solid pickup - 55 gal. drums 9.00 EA $217.8000 $1,960.20 <br />-10, 000 gal water storage tank 10,000 gal Haul to cert. dump - 9K-12K gal. 1.00 EA $1,050.0000 $1,050.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />JOB COST Subtotal (unadjusted): $147,771 Total Cost (adjusted for location): $136,422