My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-20_REVISION - M1991081 (6)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1991081
>
2008-02-20_REVISION - M1991081 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:17 AM
Creation date
12/9/2008 1:34:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1991081
IBM Index Class Name
REVISION
Doc Date
2/20/2008
Doc Name
FW increase
From
DRMS
To
Charles Bud Keeling
Type & Sequence
SI1
Email Name
KAP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 002 State : Colorado Permit/job# : M-1991-081 <br />Date : 0113112008 County : Huerfano Abbreviation :none <br />User : KAP Site : Keeling Pit Filename : M081-002 <br />Agency or organization name: Colorado Division Of Reclamation Mining And Safety <br />Permit or other job action : Bond Recalculation related to Inspection <br />Task description :Spread toposoil <br /> <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series Il - 8SU (200: Horsepower : 310 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : 3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $57.13 NA <br />Operating cost/hour : $77.13 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $167.03 Total fl eet cost/hour : $167.03 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 8,100 CCY factor : 1.215 volume : 9,842 LCY <br /> <br />Source of estimated volume :Inspection <br />Source of estimated swell factor :topsoil <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 1,400.0 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Compacted fill or embankment Spoil pile: 0.80 (fnd-r!) <br /> Push gradient : 1.60 (Cat HB) <br />Average push gradient : 30.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,600 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.57 <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production : 796.61 LCY/hr <br /> Adjusted fleet production : 796.61 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 12.35 Hours <br />Unit cost : $0.210 /LCY Total job cost : $2,064 <br />
The URL can be used to link to this page
Your browser does not support the video tag.