My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-20_REVISION - M1991081 (6)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1991081
>
2008-02-20_REVISION - M1991081 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:17 AM
Creation date
12/9/2008 1:34:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1991081
IBM Index Class Name
REVISION
Doc Date
2/20/2008
Doc Name
FW increase
From
DRMS
To
Charles Bud Keeling
Type & Sequence
SI1
Email Name
KAP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />Date : 06-Feb-2008 Permit or job no. M-1991-081 Site :Keeling Pit <br />User: KAP Abbreviation : none State :Colorado <br />Filename: M081-000 County :Huerfano <br />Agency or organization name : Colorado Division Of Reclamation Mining And Safety <br />Permit or job action : Bond Recalculation related to Inspection <br />TASK L IST (DIRECT COSTS) FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />001 - Grade Highwalls 3:1 dozer 1 25.0 $4,183 <br />002 -Spread Topsoil dozer 1 12.3 $2,064 <br />003 -Rip compacted areas ripper 1 5.8 E?E <br />021 <br />004 -Revegetation revege 1 5.0 709 <br />005 -Mobilize/demobilize mobilize 1 4.2 $1,151 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS : 52,4 $12,128 <br />' includes inflation factor adjustment of <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - <br />NA % <br />Liability insurance <br />Performance bond <br />Job superintendent <br />Profit <br />assume net hours = 50% of task hours <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT - <br />Financial warranty processing (legal/related costs) <br />Engineering work and/or contract/bid preparation <br />Reclamation management and/or administration <br />CONTINGENCY - <br />TOTAL DIRECT COST `=IT W7Z,1Ltf <br />2.02 % of direct total = $245 <br />1.05 % of direct total = $127 <br />26.22 hrs* ...$/hr $41.25 total = $1,082 <br />10.00 % of direct total = $1,213 <br /> TOTAL O & P = $2,667 <br /> CONTRACT AM OUNT (direct+ 0 & P) = $14,795 <br />500.00 total $ NA total = $500 <br />4.25 % of cntr. NA total = $629 <br />5.00 % of cntr. NA total = $740 <br />NA' NA total = NA <br />`contingencies accounted for at task level TOTAL INDIRECT COST = $4,535 <br />TOTAL BOND AMOUNT (direct + indirect) _ $16,663
The URL can be used to link to this page
Your browser does not support the video tag.