My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-19_REVISION - M1981207
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981207
>
2008-02-19_REVISION - M1981207
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:25:30 PM
Creation date
12/9/2008 1:32:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981207
IBM Index Class Name
Revision
Doc Date
2/19/2008
Doc Name
Approval
From
DRMS
To
Western Slope Aggregates
Type & Sequence
TR6
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
02-19-08;11;54AM; <br />;970 241 1516 # 7/ 7 <br />Agency or organization name :DRMS <br />Permit or other job action : TR-06 <br />Task description : Concrete Plant Demolition <br />HOURLY EQUIPMENT COST <br />Basic machine: Cat DBR Series ll - 8SU (200: Horsepower ; 310 <br />Blade type : Sarni-Universal <br />Attachment no. 1 :RODS Cab Shift basis : 1 per day <br />Attachment no. 2: NA <br /> Data source : _ (CRG) <br />. <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $50.32 NA <br /> Operating cost/hour : $77.13 100 <br /> Ripper op. costlhour : $0.00 NA <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $160.22 Total fleet cosithour : $960.22 <br /> <br />MATERIAL QUANTI`nES <br />Initial Swell Loose <br />volume : 6,000 CCY Factor : 1.925 volume : 6,750 LCY <br /> <br />Source of estimated volume :Staff Estimate <br />Source of estimated swell factor : CAT Handbook <br /> <br />HOURLY PRODUCTION Job Condition C orrection Factors Source <br />Average push distance : 200 feet <br />Unadjusted hourly production : 491.9 LCY/hr <br />Material consistency description : <br />Compacted IUI or embankment <br />Average push gradient : 0.00 % (/ <br />Average site altitude : 6,160 feet <br />Material weight : 3,250 lbs/LCY <br />Weight description <br />Gravel - Pitrun <br />JOB *nME AND COST <br />Fleet size : 7 Dozer(s) <br />Unit cost : $1.027 /LCY <br />Operator skill : 0.75 (avg.) <br />Material Consistency : 0.90 (Cat HS) <br />Dozing method : 1.00 _ (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (7shift/day) <br />Spoil pile : 0.80 (Mcf-rt) <br />Push gradient: 1.00 (Cat HS) <br />_ <br />Altitude : 1.00 (Cat HB) <br />Material weight : <br />Blade type : 0.71 <br />1.00 (Cat HB) <br />(S/SU/U) <br />Net correction : 0.32 <br />Adjusted unit production : 155.97 LCY/hr <br />Adjusted fleet production : 956.97 LCY/hr <br />Total job lime : 43.28 Hours <br />Total job cost : $6,934
The URL can be used to link to this page
Your browser does not support the video tag.