My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-19_REVISION - M1981207
>
Day Forward
>
Revision
>
Minerals
>
M1981207
>
2008-02-19_REVISION - M1981207
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:25:30 PM
Creation date
12/9/2008 1:32:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981207
IBM Index Class Name
Revision
Doc Date
2/19/2008
Doc Name
Approval
From
DRMS
To
Western Slope Aggregates
Type & Sequence
TR6
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
02-19-08;11:54AM; <br />;970 241 1516 # 5/ 7 <br />CIRCES Cost Estimatina Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />TASK 6S7 (DIRECT 005751 <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />01a -Concrete Plant Demolition demolish 1 40.0 $40,565 <br />02a -Place 6,000 CY of Overburden Over Conc. Plant Slab and Retaining Wall dozer 1 43.2 _ $6.934 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS- 53.2 $47,499 <br />Incdudes Inflation factor adjustment of : NA % TOTAL DIRECT COST " $47,499 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT. Liability insurance : 2.02 _% of direct total 5959 <br />Performance bond : 1.05 % of direct total $499 <br />Job superintendent : NA" NA NA total NA <br />Profit : 10.00 % of direct total $4,750 <br />• not required (or eqp, operator serves as supor) TOTAL O & P $6,208 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT - CONTRACT AMOUNT (direct + O & P) _ $53,707 <br />Financial warranty processing (legal/related costs) : 500.00 total $ NA total=- -.. $50_0 <br />Engineering work and/or contractlbld preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cnir. NA total = $2,685 <br />CONTINGENCY - NA' NA total = NA <br />' contingenctas accounted for at task level TOTAL INDIRECT COST C - _$9,393 <br />TOTAL BOND AMOUNT (direct + indirect) _ $56,892
The URL can be used to link to this page
Your browser does not support the video tag.