Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Agency or organization name : DRMS <br />sheet 1 of 2 <br />Task #: 004 State : Colorado <br />Date : 0112312008 County : Prowers <br />User : DEZ Site : Wiley Pit <br />Permit or other job action : Calculate Bond For New Operator - So <br />Task description :Mobilize/demobilize equipment <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br /> Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tra ctor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat D8R Series 11 - 8U (200 53.17 $50.59 $125.45 2 $352.08 $250.90 $0.00 <br />-Revegetation Equipment 25.00 $60.00 $88.67 1 $148.67 $88.67 $0.00 <br />Permit/job #:M-1997-223 <br />Abbreviation :none <br />Filename :M223-004 <br />Subtotals :1 $500.75 1 $339.57 1 $0.00