My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-01-22_REVISION - M1980085
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980085
>
2008-01-22_REVISION - M1980085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:01:38 PM
Creation date
12/9/2008 9:02:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980085
IBM Index Class Name
REVISION
Doc Date
1/22/2008
Doc Name
Request extension of decision date
From
Grege Lewicki and Associates
To
DRMS
Type & Sequence
AM2
Email Name
SSS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jan 22 08 02:39p Greg Lewicki and Associat 3033466934 p•4 <br />In order to prevent the formation of gullies and other erosion features along the slope of the pit <br />during the revegatation process, a two-stage revegatation plan will be used. An initial round of <br />seeding and mulching will take place in the spring. This will be a seed mix of temporary annuals <br />as seen in the following seed mix <br />RECEEVED <br />Temporary Seed Mix JAN 2 2 2008 <br />SpeciesCommon Name Seedine Rate GRAND JUNC'I oii riELD OFFICE <br />1. Barley 70 lbs/acre DMSION OF <br />2. Winter Wheat 70 lbs/acre 6r RECLAMATI®It9 Ropl,t!G &?Ag.EW <br />3. Oats 70 lbs/acre <br />Also, the slopes will be roughed, and furrows will be installed via dozer to encourage water <br />catching during storms. The furrows will be roughly Vin depth, 100' long between breaks, and <br />be placed along the contour every 100' of slope. The furrows will be placed only along the new <br />slopes created by additional mining from this amendment. At the end of the summer, Elam will <br />repair and regrade any areas of the slope on which erosion features have formed. In the fall the <br />permanent seeding will take place using the above approved seed mix. <br />4 Post Reclamation Site Drainage <br />Almost the entire permit area will drain into the large opening which is created by mining and <br />will likely run towards the northeast corner of the pit. The only areas which will not drain <br />towards the opening created will be on lands which were not disturbed by mining or small <br />portions of the reclaimed topsoil stockpiles. <br />5. Weed Control <br />Elam Construction, Inc. will use BMP's to control weeds. Problem weeds will be monitored <br />closely each spring for as long as the permit is active to determine if they are invading the area. <br />Weed control will be initiated if the problem becomes serious. The Division of Minerals and <br />Geology will be consulted regarding any weed infestation area and any control measures prior to <br />their initiation. It may be necessary to control weeds by mowing after the first year; the feas- <br />ibility of chemical weed control methods will be studied should it be necessary. The plan does <br />Vagneur Pit June 07 <br />E-5
The URL can be used to link to this page
Your browser does not support the video tag.