My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-05_REVISION - M1978271
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1978271
>
2008-02-05_REVISION - M1978271
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:16 AM
Creation date
12/9/2008 9:00:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978271
IBM Index Class Name
REVISION
Doc Date
2/5/2008
Doc Name
FW increase
From
DRMS
To
Asphalt Gravel Products, Inc.
Type & Sequence
SI1
Email Name
KAP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />SCRAPER - ONLY WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : Colorado Division Of Reclamation Mining And Safety <br />Task #: 004 State : Colorado Permit/job #: M-1978-271 <br />Date : 0111812008 County : Conejos Abbreviation :none <br />User: KAP Site :Garrett Pit Filename : M271-004 <br />Permit or other job action : Bond Recalculation Related to Inspectin <br />Task description : Haul topsoil and fines to be spread <br />HOURLY EQUIPMENT COST <br />Model : Cat 623G Shift basis : 1 per day <br />Cost Breakdown : Job utilization % Horsepower : 365 <br />Ownership cost/hour : $75.32 NA Weight (UST) : 40.92 <br />Operating cost/hour : $103.03 100 Cost data source : (CRG) <br />Operator cost/hour : $24.95 NA <br />Total unit cost/hour : $203.30 Total fleet cost/hour : $203,30 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 28,681 CCY factor : 1.215 volume : 34,847 LCY <br />Source of quantity take-off :Reclamation Plan <br />Source of estimated swell factor : Top Soil <br />HOURLY PRODUCTION <br />Hauling Capacity : <br />Scraper Payload (weight) Basis : Scraper Bowl (volume) Basis : <br />Material weight : 1,600 pounds/LCY Struck volume : 18.00 LCY <br />Material description : Heaped volume : 23.00 LCY <br />Top Soil Average volume : 20.50 LCY <br />Rated payload : 55,000 pounds <br />Payload capacity : 34.38 LCY Adjusted capacity : 20.50 LCY <br />Cycle Time (load + haul + spread + return) : Loading time : 0.90 minutes <br /> Maneuver and spreading time : 0.70 minutes <br />Travel time : loading time per pair on push-pull models <br />Route Distance (feet) Grade (%) Roll. res.(%) Total res.(%) Velocity (fpm) Travel time (min.) <br />Haul: 1,000 5.0 5.0 10.0 659 1.54 minutes" <br />Return : 1,000 -5.0 5.0 0.0 2,732 0.37 minutes " <br />" travel time adjusted for acceleration and deceleration at load and dump points <br />velocities are max. attainable per total resistance shown, not average Total cycle time 3.51 minutes <br />Job Condition Correction Factors : <br />Site altitude (feet) : 7,740 Adiusted Hourly Production ; <br />Altitude adjustment factor : 1.00 (Cat HB) Unadjusted unit production : 350.66 LCY/Hour'** <br />Job efficiency factor : 0.83 (1 shift/day) Adjusted unit production : 291.05 LCY/Hour <br /> Adjusted fleet production : 291.05 LCY/Hour <br />Net job correction factor : 0.83 2 times volume on push-pull models <br />JOB TIME AND COST <br />Fleet size : 1 Scraper(s) Total job time : 119.73 Hours <br />Unit cost : $0.698 /LCY Total job cost : $24,341
The URL can be used to link to this page
Your browser does not support the video tag.