My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-05_REVISION - M1982033
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1982033
>
2008-02-05_REVISION - M1982033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:16 AM
Creation date
12/9/2008 9:00:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982033
IBM Index Class Name
REVISION
Doc Date
2/5/2008
Doc Name
FW increase
From
DRMS
To
Malouff Construction Inc.
Type & Sequence
SI1
Email Name
KAP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />PROJECT IDENTIFICATION sheet 1 of 2 <br />Agency or organization name : Colorado Division Of Reclamation Mining And Safety <br />Task #: 003 State : Colorado Permit/job #: M-1982-033 <br />Date : 0111612008 County : Conejos Abbreviation :none <br />User: KAP Site :Malouff Pit Filename : M033-003 <br />Permit or other job action :Bond Recalculation Related To Inspection <br />Task description :Mobilize/Demobilize <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br /> Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tra ctor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat D8R Series 11- 8SU (20 47.17 $50.32 $117.55 1 $167.87 $117.55 $0.00 <br />-CAT 120H 12.52 $17.69 $88.67 1 $106.36 $88.67 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $274.23 $206.22 $0.00
The URL can be used to link to this page
Your browser does not support the video tag.