Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 002 State : Colorado <br />Date : 1210512008 County: Rio Blanco <br />User : JDM Site : Deserado Mine <br />Agency or organization name : CDRMS <br />Permit or other job action : MR-139 <br />Task description : Regrade Additional Pad at RDH-03 <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shiftbasis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $71.49 NA <br /> Operating cost/hour : $103.27 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $207.53 Total fl eet cost/hour : $207.53 <br /> <br />MATERIAL QUANTITIES .. ....... .- <br />Initial Swell Loose <br />volume : 75 BCY factor : 1.250 volume : 94 LCY <br /> <br />Source of estimated volume: Operator Estima te <br />Source of estimated swell factor : CAT Handbook <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 2,110.5 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-rt) <br /> Push gradient : 0.90 (Cat HB) <br />Average push gradient:- 5.00 % (pos) Altitude : 1.00 (Cat HS) <br />Average site altitude : 5,700 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2550 Ibs/LCY Net correction : 0.37 <br />Weight description <br />Earth - Drv packed <br />Adjusted unit production <br />Adjusted fleet production <br />770.62 <br />770.62 <br />_LCY/hr <br />LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time <br />Unit cost : $0.269 /LCY Total job cost <br />Permit/job# : C-1981-018 <br />Abbreviation :none <br />Filename : C018-002 <br />0.12 Hours <br />$25 <br />{