Yoast TR-37 Proposed Decision Revised Pages and Maps Listing
<br />Vol. 1, Tab 1
<br />• Replace Text P. 4
<br />Vol. 1, Tab 3
<br />• Replace TOC and Entire Text Section
<br />• Replace Attachment 3-5
<br />• Replace Appendix 3-2
<br />• Appendix 3-3; replace Tract Pages 3,4,6,7,8,9,10,18,20,22 (2
<br />shts),30,31,33,34,37,39,40,43,45(2 shts),
<br />46(2shts),47,49,50,51,64,65,67,68,70,76,77, 81,86,93,94,97,98.
<br />Vol. 6, Tab 13
<br />• Replace TOC & Text pages 3-8,11,11 a,21 &22.
<br />• Attachment 13-3A, Replace Attachment Slip Sheet and insert new introduction.
<br />• Attachment 13-3A.1-Insert new attachment behind the new 13-3A introduction.
<br />• Attachment 13-3A.2. Replace slip sheet at the beginning of the As-Built Report
<br />(TR-30, dated 05/07).
<br />• Attachment 134A, replace existing attachment slip sheet and insert new
<br />introduction.
<br />• Attachment 13-4A.1, insert new attachment behind the new Attachment 13-4A
<br />introduction.
<br />• Attachment 134A.2, replace slip sheet at the beginning of the As-Built Report
<br />(dated 12/12/97).
<br />Vol. 6A, Tab 13
<br />• Attachment 13-12-replace Attachment Table of Contents and text pages.
<br />• Attachment 13-12-replace TOC pages i, ii, and iii and text pages 13-12.1
<br />through 13-12.16
<br />• Attachment 13-12-replace existing Figure 13-12.1 (p. 13-12.17).
<br />• Attachment 13-12-replace existing Figure 13-12.2 (p.13-12.18).
<br />• Attachment 13-12-replace existing Figure 13-12.3, ...Channel Designs (Sht 1,2,
<br />and 3 on pages 13-12.9 through 13-12.21).
<br />• Attachment 13-12, Appendix 13-12.1, SEDCAD4 Results-replace Pond 012A
<br />Design SEDCAD demonstration (pp. 13-12.1-45 to 13-12.1-97A).
<br />• Attachment 13-12, Appendix 13-12.2, replace Appendix TOC.
<br />• Attachment 13-12, Appendix 13-12.3, PM Channel Design SEDCAD4 Results-
<br />replace appendix TOC (p. 13-12.3-i)
<br />1
|