My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-12-08_REPORT - M1996049
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1996049
>
2008-12-08_REPORT - M1996049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 10:21:30 AM
Creation date
12/8/2008 2:22:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1996049
IBM Index Class Name
REPORT
Doc Date
12/8/2008
Doc Name
Annual Fee/Report/Map
From
Everist Materials, LLC
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Email Name
ACS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PO Box 1150 <br />28755 Hwy #9 <br />Silverthorne, CO 80498 <br />Everist Materials, LLC Phone 970.468.2521 <br />Fax 970.468.2756 <br />December 04, 2008 <br />State of Colorado <br />Division of Reclamation, Mining, and Safety <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />RE: Annual Report, Map, and Annual Fee Request for M-1996-049 <br />Enclosed please find the Annual Report Form, Map, and Annual Fee for the following <br />operation: <br />PERMITTEE NAME: <br />PERMIT NO.: <br />OPERATION NAME: <br />ANNIVERSARY DATE <br />ANNUAL FEE: <br />COUNTY: <br />Everist Materials, LLC. <br />M-1996-049 <br />Maryland Creek Ranch <br />December 20, 2008 <br />$791.00 (Check # 017808) <br />Summit <br />For 2008, operations were continuous throughout the year. Mining was substantially <br />completed in Cell #3 and began in Cell #4. Revegation along Hwy 9 and between Cell <br />#1 and Cell #2 (as noted in the report filed December 18, 2007) has been successful. <br />Inert fill was placed in the southern end of Cell #3 as an ongoing effort to reduce exposed <br />ground water. <br />For 2009, mining will continue in Cell #4. Concurrent reclamation will begin in Cell 93. <br />Inert fill will continue to be placed in the southern end of Cell #3. <br />If you have any questions, please feel free to contact me at 970-468-3653. <br />Sincerely, <br />?zec ? <br />M. Eric, Blaylock <br />Planning and Permitting
The URL can be used to link to this page
Your browser does not support the video tag.