Laserfiche WebLink
ecs <br />r? <br />WATEE CONSTRUCTION COMPANY <br />P.O. Box 1908 <br />STERLING, COLORADO 80751 <br />December 5, 2008 <br />Mr. Tony Waldron <br />Division of Minerals and Geology <br />Minerals Section <br />1313 Sherman Street Suite 215 <br />Denver, Colorado 80203-2273 <br />Mr. Waldron: <br />Re: AnnualR5?Port (112) <br />MLR No.,'M-1986-147, Harley Pit #1 <br />Anniversary Date: 12/02/08 <br /> <br />?DEC D ?? ????? <br />_: iamation, <br />Divisiu*i I <br />M;ning and Sa$atl <br />This pit HAS NOT been granted a Temporary Cessation, and it <br />HAS operated more than 180 days this year. The Financial Warranty <br />for this operation is $71,755.00, the permitted area is in Logan <br />County, covers 89.53 ac. ± and the pit is not phased. The bond <br />was reevaluated in May 2007 reclaimed area was released from the <br />permit area. As required in Rule 1.6 the MINE PERMIT SIGN is at the <br />entrance to the pit and the boundary has been outlined with posts <br />to delineate the Permit Boundary. <br />The annual report requirements in the MLRB Rules and Regula- <br />tions are addressed in the following report. Please refer to the <br />2008 ANNUAL REPORT MAP submitted with this report for areas dis- <br />cussed in this report. <br />(1) We continued to remove material stockpiled last year. The <br />west area partially stripped and we found there was little <br />gravel in this area (tan). Approximately 2 feet of usable <br />material was removed and reclamation began. The working <br />floor area where material is stockpiled and processes covers- <br />approximately - 17. 2 3 - acres (orange) - and -remains -unchanged <br />from last year. <br />(2) In the west area the slopes have been completed and resoiled <br />has begun and will continue until complete using material <br />removed from the stripping is placed in this area (tan). <br />Grass has germinated on the 1.56 acres +/- seeded in 2006 <br />(green) and we continue to monitoring the area at this time. <br />(3) We will continue to removed stockpiled material and mine <br />into the working face on the south side of the mine floor <br />(brown). Stripping will continue on the area south of the <br />mine face. The soil will be stockpile around the mine or <br />placed on west area where final grading is complete. We <br />expect to mine approximately 2.00 acres next year.