My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-05_REVISION - M1991136
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1991136
>
2008-02-05_REVISION - M1991136
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:16 AM
Creation date
12/8/2008 1:40:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1991136
IBM Index Class Name
REVISION
Doc Date
2/5/2008
Doc Name
Reclamation cost update & notice of surety increase
From
DRMS
To
United Co./Oldcastle S.W.
Type & Sequence
SI1
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />Date : 05-Feb-2008 Permit or job no. M-1991-136 Site :River Road Pit <br />User : THM Abbreviation : none State : Colorado <br />Filename : M136-000 County :Mesa <br />Agency or organization name: DRMS <br />Permit or job action :Final Reclamation Cost Estimate Update <br />TASK LIST (DIRECT COSTS) <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />01a -Grade NW slopes to 3H:1 V dozer 1 9.7 $1,642 <br />02a -Spread Soil Amendments on Slopes dozer 1 0.1 $7 <br />03a -Revegetation of 9.4 Acres revege 1 24.0 $13,056 <br />04a -Initial Mobilization mobilize 1 2.6 $751 <br />04b -Secondary Seeding Mobilization mobilize 1 2.6 $299 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS: 39.1 $15,755 <br />* includes inflation factor adjustment of : NA % TOTAL DIRECT COST * =1 $15,755 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - Liability insurance : 2.02 % of direct total = $318 <br />Performance bond : 1.05 % of direct total = $165 <br />Job superintendent : NA* NA NA total = NA <br />Profit : 10.00 % of direct total = $1,576 <br />* not required (or eqp. operator serves as super.) TOTAL O & P = $2,059 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT - CONTRACT AMOUNT (direct + O & P) _ $17,814 <br />Financial warranty processing (legal/related costs) : 0.00 total $ NA total = _ $0 <br />Engineering work and/or contract/bid preparation : NA NA NA total =_ _ NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $891 <br />CONTINGENCY - NA* NA total = NA <br />* contingencies accounted for at task level TOTAL INDIRECT COST = $2,950 <br />TOTAL BOND AMOUNT (direct + indirect) _ $18,705
The URL can be used to link to this page
Your browser does not support the video tag.