My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-05_REVISION - M1991136
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1991136
>
2008-02-05_REVISION - M1991136
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:16 AM
Creation date
12/8/2008 1:40:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1991136
IBM Index Class Name
REVISION
Doc Date
2/5/2008
Doc Name
Reclamation cost update & notice of surety increase
From
DRMS
To
United Co./Oldcastle S.W.
Type & Sequence
SI1
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADJUSTED COSTS Ownership Costs Overhaul and Oper ating Costs <br /> Overhaul Field Repair <br /> Depreciation CFC Overhead Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br />Acquisition cost : $18.23 NA NA NA NA NA NA NA NA NA NA <br />life -Dozer and ROPS : <br />Econ $18.23 NA NA $7.24 $13.57 $8.05 $13.09 NA NA NA NA <br />. <br />-Attachment no. 2 : NA NA NA $1.21 $1.30 $2.21 $1.31 NA NA NA NA <br />Annual usage : $27.50 $12.34 $17.29 NA NA NA NA NA NA NA NA <br />Double shifts : $20.62 $6.17 $8.64 NA NA NA NA NA NA NA NA <br />Triple shifts : $18.34 $4.11 $5.76 NA NA NA NA NA NA NA NA <br />Mechanic labor-Dozer and ROPS : NA NA NA $5.65 NA $6.28 NA NA NA NA NA <br />-Attachment no. 2 : NA NA NA $0.94 NA $1.72 NA NA NA NA NA <br />Fuel/lube -Dozer and ROPS : NA NA NA NA NA NA NA $30.56 $5.97 $0.00 $2.01 <br />Attachment no. 2 : NA NA NA NA NA NA NA $0.00 $0.34 $0.00 $1.09 <br /> <br />ADJUSTED COST SUBTOTALS Ownership Costs Overhaul an d Operating Costs <br />Overhaul Field Repair <br />Depreciation CFC Overhead Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br />ROPS and Attachment no. 2: <br />Dozer Dozer and ROPS <br />, <br />Single shifts : $27.50 $12.34 $17.29 $5.65 $13.57 $6.28 $13.09 $30.56 $5.97 $0.00 $2.01 <br />Double shifts : $20.62 $6.17 $8.64 Attachment no. 2 <br />Triple shifts : $18.34 $4.11 $5.76 $0.94 $1.30 $1.72 $1.31 $0.00 $0.34 $0.00 $1.09 <br /> <br />HOURLY OPERATOR WAGES Base Fringe F.I.C.A. Unempl. Wk.Comp. Total <br /> Rate Benefits 7.65% 6.20% 9.80% ($/hr) Shift Differential Colorado labor zone : 1 <br />Dozer operator (< 70hp) $20.67 $7.22 $1.58 $1.28 $2.03 $32.78 Day t $0.00 Two shift per day average : $0.15 <br />Dozer operator (>=70hp) $20.67 $7.22 $1.58 $1.28 $2.03 $32.78 Swing $0.30 Three shift per day average : $0.25 <br />Mechanic $20.97 $7.22 $1.60 $1.30 $2.06 $33.15 Night : $0.45 <br />iOURLY EQUIPMENT COST SUMMARY Ownership Operating and Overhaul <br />Machine Attachments Operator Total <br />Cost/hr ($) <br />Single shifts : $57.13 $77.13 $6.71 $32.78 $173.74 <br />Double shifts : $35.44 $77.13 $6.71 $32.93 $152.20 <br />Triple shifts : $28.21 $77.13 $6.71 $33.03 $145.07 <br />EQUIPMENT PERFORMANCE DATA <br /> <br /> <br />Description Horsepower <br /> <br /> <br />(FHP) Transmission <br /> <br /> <br />Type Weight <br /> <br /> <br />(UST) Length <br /> <br /> <br />(ft) Width <br /> <br /> <br />(ft) Height <br /> <br /> <br />(ft) <br />I <br /> <br />Fuel <br />type <br /> <br />Ripper <br />type <br />Dozer : Cat D8R Series 11- 8SU (2 310 NA 41.8 22.7 8.7 11.5 diesel NA <br />Blade: Semi-Universal NA NA 5.4 NA 12.9 5.5 NA NA <br />Attachment no. 1 : BOPS Cab NA NA NA NA NA NA NA NA <br />Attachment no. 2: 13-shank ripper NA NA 5.4 3.6 7.1 2.6 NA Adj. Parallelogram <br /> Total weight : 52.5 (UST)
The URL can be used to link to this page
Your browser does not support the video tag.