My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-01-30_REVISION - M1980085
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980085
>
2008-01-30_REVISION - M1980085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:01:38 PM
Creation date
12/8/2008 1:40:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980085
IBM Index Class Name
REVISION
Doc Date
1/30/2008
Doc Name
3rd adequacy review response
From
Greg Lewicki and Associates
To
DRMS
Type & Sequence
AM2
Email Name
SSS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mininiz Timetable <br /> <br /> <br />Task # <br /> <br />Description Time <br />needed <br />ears <br /> <br />1 Stripping of topsoil and mining year 1 gravel, construct 2 topsoil <br />stockpiles and reclaim northern end of current it. <br />1 <br />2 Stripping of minor topsoil and mining year 2 gravel. 1 <br />3 Stripping of minor topsoil and mining year 3 gravel. 1 <br />4 Mining year 4 gravel. 1 <br />5 Stripping of topsoil and mining year 5 gravel. 1 <br />6 Stripping of topsoil and mining year 6 gravel. 1 <br />7 Stripping of topsoil and mining year 7 gravel. 1 <br />8 Stripping of topsoil and mining year 8 gravel. 1 <br /> <br />9 Stripping of topsoil and mining year 9 gravel and reclaim portion of <br />year 8 area. <br />1 <br />10 Stripping of topsoil and mining year 10 gravel. 1 <br /> <br />11 Stripping of topsoil and mining year 11 gravel, and reclaim year 10 <br />slopes which are mined 3H:1 V <br />1 <br /> <br />12 Stripping of topsoil and mining year 12 gravel, and reclaim year 11 <br />slopes which are mined 3H:1 V. This is a large reclamation area. <br />1 <br /> <br />13 Stripping of topsoil and mining year 13 gravel, and reclaim year 12 <br />slopes which are mined 3H:1 V. <br />1 <br /> <br />14 Stripping of topsoil and mining year 14 gravel, and reclaim year 13 <br />slopes which are mined 3H:1 V. <br />1 <br /> <br />15 Mining year 15 gravel, and reclaim year 14 slopes which are mined <br />3H:1V <br />1 <br /> <br />16 Mining year 16 gravel, and reclaim year 15 slopes which are mined <br />3H:1V <br />1 <br />Total 16 <br />As described in the mining plan, all phases of the mine are planned by year; therefore the <br />duration of each phase is one year. The topsoil will be stripped from the mining phase each year <br />immediately prior to the mining, if topsoil stripping is required for that year. <br />4. Equipment <br />The following equipment or comparable equipment is expected to be used during the mining of <br />the pit expansion area: <br />Vagneur Pit June 07 D-6
The URL can be used to link to this page
Your browser does not support the video tag.