My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-01-30_REVISION - M1980085
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980085
>
2008-01-30_REVISION - M1980085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:01:38 PM
Creation date
12/8/2008 1:40:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980085
IBM Index Class Name
REVISION
Doc Date
1/30/2008
Doc Name
3rd adequacy review response
From
Greg Lewicki and Associates
To
DRMS
Type & Sequence
AM2
Email Name
SSS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i 1 <br />1 1 <br />I ? <br />1 1 <br />R .riapcrn I <br />1 I <br />I i <br />I <br />"Cr <br />U"rw <br />tI ? , <br />rr? t. d iee urr <br />f waroaeo <br />r <br />i <br />J <br />Fr" <br />? a \ <br /> <br />SAMU.(ftsAMID) <br />Figure 2 - Employee Housing Detail <br />FUEL STORAGE AREAS - Two primary fuel storage areas are currently located on the site. <br />The first is a 1,200 square foot area north of the main office; the other is near the concrete batch <br />plant. An asphalt oil tank is located adjacent to the asphalt plant, and a diesel fuel tank is located <br />near the portable gravel crushing unit. All fuel is stored in above ground tanks that have lined <br />containment dikes to prevent any discharges of fuel from leaving the site or percolating into the <br />ground. Each containment area is capable of holding at least 110% of the largest tank above it. <br />An engineered Spill Prevention, Control and Counter Measure Plan (SPCC) is on file with the <br />Vagneur Pit June 07 D-11
The URL can be used to link to this page
Your browser does not support the video tag.