Laserfiche WebLink
ADJUSTED COSTS Ownership Costs <br /> <br />Depreciation CFC Overhead Overhaul and Operating Costs sheet 2 of 2 <br />Overhaul Field Repair <br />Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br />Acquisition cost : $10.70 NA NA NA NA NA NA NA NA NA NA <br />Econ.life -Machine and Attach. no. 1 : $10.70 NA NA $2.11 $3.96 $2.62 $3.82 NA NA NA NA <br />-Attachment no. 2: NA NA NA $0.00 $0.00 $0.00 $0.00 NA NA NA NA <br />Annual usage : $15.64 $7.13 $6.72 NA NA NA NA NA NA NA NA <br />Double shifts : $11.73 $3.57 $3.36 NA NA NA NA NA NA NA NA <br />Triple shifts : $10.43 $2.38 $2.24 NA NA NA NA NA NA NA NA <br />Mech. Ibr.-Machine and Attach. No. 1: NA NA NA $1.65 NA $2.04 NA NA NA NA NA <br />-Attachment no. 2: NA NA NA $0.00 NA $0.00 NA NA NA NA NA <br />Fuel/lube -Machine and Attach. No. 1: NA NA NA NA NA NA NA $20.18 $3.84 $4.44 $0.46 <br />Attachment no. 2: NA NA NA NA NA NA NA $0.00 $0.00 $0.00 $0.00 <br />ADJUSTED COST SUBTOTALS <br /> <br />Depreciation Ownership Costs <br /> <br />CFC <br /> <br />Overhead <br />Overhaul <br />Labor Parts Overhaul and Operating Costs <br />Field Repair <br />Labor Parts Fuel Lube Tires G.E.C. <br />Basic Machine and attachments No. 1 and No. 2: Basic Machine and Attachment No. 1 <br />Single shifts : $15.64 $7.13 $6.72 $1.65 $3.96 $2.04 $3.82 $20.18 $3.84 $4.44 $0.46 <br />Double shifts : $11.73 $3.57 $3.36 ttachment No. 2 : <br />Triple shifts : $10.43 $2.38 $2.24 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />HOURLY OPERATOR WAGES Base Fringe F.I.C-A. Unempl. Wk.Comp. Total <br /> Rate Benefits 7.65% 6.20% 9.80% ($/hr) Shift Differential Colorado labor zone : 2 <br />Loader operator (-6cy) $20.67 $7.22 $1.58 $1.28 $2.03 $32.78 Day : $0.00 Two shift per day average : $0.15 <br />Loader operator (> 6cy) $20.82 $7.22 $1.59 $1.29 $2.04 $32.96 Swing : $0.30 Three shift per day average : $0.25 <br />Mechanic $20.97 $7.22 $1.60 $1.30 $2.06 $33.15 Night : $0.45 <br />HC <br />URLY EQUIPMENT COST SUMMARY Ownership Operating and Overhaul <br />Machine Attachments Operator Total <br />Cost/hr ($) <br />Single shifts : $29.49 $40.39 NA $32.78 $102.66 <br />Double shifts : $18.66 $40.39 NA $32.93 $91.97 <br />Triple shifts : $15.05 $40.39 NA $33.03 $88.46 <br />EQUIPMENT PERFORMANCE DATA <br />Description Type Struck <br />Capacity (cy) Heaped <br />Capacity (cy) Weight <br />(UST) Weight <br />(MT) Length <br />(ft.) Width <br />(ft.) Height <br />(ft.) Min. turning <br />circle (ft.) Horsepower <br />(fhp) Fuel <br />type <br />CAT 966G (2002) NA 4.06 4.75 25.10 NA 29.58 10.33 11.67 48.25 235.00 Diesel <br />ROPS Cab NA NA NA NA NA NA NA NA NA NA NA <br />NA NA NA NA NA NA NA NA NA NA NA NA <br />Travel speeds (mph) : 1st (or max.) 2nd 3rd 4th 5th 6th 7th 8th Min. dump Max.dump <br />Forward : 4.5 7.8 13.5 23.1 NA NA NA NA clear.(ft) ht.(ft) <br />Reverse : 5.1 8.9 15.3 26.2 NA NA NA NA NA 9.75 <br />Loader bucket type Compaction Maximum vertical Max. horizontal Excavator bucket capacity (cy) Lift capacity (lbs) Maximum dig/rip Shank Number <br />or compactor drum type width per pass (ft.) reach height (ft) reach (ft) small medium large optimum max.reach depth (ft) spacing of shanks <br />GP with teeth NA NA NA NA NA NA NA NA NA NA NA