My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-01_REVISION - M1977205
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977205
>
2008-02-01_REVISION - M1977205
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:02:56 PM
Creation date
12/8/2008 1:39:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977205
IBM Index Class Name
REVISION
Doc Date
2/1/2008
Doc Name
TR approval and bond calculation
From
DRMS
To
Greg Lewicki and Associates
Type & Sequence
TR2
Email Name
SSS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Agency or organ <br />Task # : 09a <br />Date : 0112812008 <br />User : SSS <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />ization name: DRMS <br />State : Colorado Permit/job #: M-1977-205 <br />County : Delta Abbreviation :none <br />Site : Tr- County Gravel Filename : M205-09a <br />sheet 1 of 2 <br />Permit or other job action : TR-02 IF A <br />Task description : Haul and spread topsoil on 8 acres of regraded area Al, Vora( <br />HOURLY EQUIPMENT COST Shift basis : 1 per day <br />Truck/loader team -Truck :Generic 15-18 cy, 6x4 <br />-Loader : CAT 966G (2002) <br />Support equipment -Load area :INA <br />-Dump area :Cat D7R DS Series 11 - 7SU <br />Road maintenance -Motor grader <br />-Water truck <br />Cost Breakdown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader NA dozer NA NA <br />% Utilization-machine : 100 89 NA 70 NA NA <br />-Ripper attachment : NA NA NA 0 NA NA <br />Ownership cost/hour : $19.20 $29.49 NA $41.70 NA NA <br />Operating cost/hour : $53.05 $36.09 NA $39.34 NA NA <br />Ripper op. cost/hour : NA NA NA $0.00 NA NA <br />Operator cost/hour : $21.72 $32.78 NA $32.78 NA NA <br />Unit subtotals : $93.96 $98.36 NA $113.81 NA NA <br />Number of units : 2 1 0 1 0 0 <br />Group subtotals : Work : $286.28 Support : $113.81 Maintenance : $0.00 <br />Total work team cost/hour : $400.09 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 8,605 LCY factor : NA volume : 8,605 LCY <br />Source of quantity take-off :Assume 8 acres covered with and average of 8" topsoil <br />Source of estimated swell factor : NA <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br />HOURLY PRODUCTION <br />Truck Capacity : <br />Truck Pavload (weiaht) Basis : Truck Bed (volume) Basis : <br />Descr. : <br />Material weight : 1,600 pounds/LCY Struck volume: <br />Rnti Heaped volume <br />Rated payload <br />Payload capacity <br />63,980 pounds Average volume: <br />39.99 LCY Adjusted volume*: <br />Final truck volume based on number of loader passes <br />truck volume adjusted to not exceed rated payload or heaped volume <br />15.00 <br />18.00 <br />16.50 <br />18.00 <br />14.96 <br />LCY <br />LCY <br />LCY <br />LCY <br />LCY <br />Loading Tool Capacity : Job Condition Corrections : Site altitude (ft.) : _ 5,380 <br />Rated capacity (nom. heaped) : 4.750 LCY Truck Loader Source <br />Descr.: Other - moist loam (100-110%) Altitude adj.: 1.000 0.920 (Cat HB) <br />Bucket fill factor : 1.050 Job efficiency : 0.830 0.830 (1 shift/day) <br />Adjusted bucket capacity : 4.987 LCY Net correction : 0.830 0.764 <br />
The URL can be used to link to this page
Your browser does not support the video tag.