Laserfiche WebLink
.I. <br />//k\ <br />/IiNk\ <br />INN¦E\ <br />UNITED STATES LIME A MINERALS, INC. <br />CoLORADo LIME Co. <br />1468 HIGHWAY 50 <br />DELTA, Co 81416 <br />(970) 874-8300 <br />Department of Natural Resources <br />Division of Reclamation, Mining and Safety <br />- 131-3-Sherman Street.-Room-24-5- -- - - - <br />Denver, CO 80203 <br />RECEIVED <br />FEB 01 2008 <br />Division of Keclamation, <br />Mining and Safety <br />Attention: Erica Crosby, Environmental Protect'on Specialist <br />RE: Monarch Quarry, Permit M-2000-098, Tech Revision 01; Adequacy Letter <br />Dear Erica: <br /> <br />January 30, 2008 <br />This letter is in response to your letter dated January 15, 2008 concerning the adequacy of Colorado Lime's <br />application for Tech Revision #01. <br />In order to adequately and accurately address the items outlined in your letter, we need to do some surveying of <br />the road and pond, and we will not be able to do this surveying until this spring, after the snow is gone from the <br />pond area. If this year is like last, we should be able to do the surveying mid to late April, and have the designs <br />completed by mid-May. <br />With this in mind, Colorado Lime requests an extension on the decision date on this TR until May 15, 2008 and <br />we do waive our right to a decision by January 30, 2008. <br />Please contact me at the number shown above or by email at tracygunnguslm.com if you have any questions, <br />concerns or need additional information. <br />Respectfully, <br />Tracy Gunn, General Manager <br />Colorado Lime Company