My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-12-05_PERMIT FILE - M2008082 (4)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008082
>
2008-12-05_PERMIT FILE - M2008082 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:38:40 PM
Creation date
12/8/2008 10:45:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008082
IBM Index Class Name
PERMIT FILE
Doc Date
12/5/2008
Doc Name
New 112c Appl., Exhibit R to Appendices
From
Ready Mixed Concrete Company
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />20.0 EXHIBIT S - PERMANENT MAN-MADE STRUCTURES <br />An appropriate engineering evaluation is provided consistent with the requirements of <br />115(4) (e). There is no evidence that the proposed mining operation will adversely affect the <br />stability of any significant, valuable, or permanent manmade structure located within 200 feet <br />of the affected land. Per the Scott Cox report, recommendations (see appendices), minimum <br />setbacks from all permanent or manmade structures shall be based on a ratio of horizontal <br />distance to vertical distance of 3:1 with the vertical distance equal to the depth of bedrock in <br />the mined area. <br />There are a number of structures located within 200 feet of the proposed mining stages <br />including the following: <br />• A house and several out buildings (Stewart Residence) are located southwest of <br />• mining Stage 3. <br />• A house and several out buildings (Schroeder Property) are located north of Stage 5 <br />and west of Stage 4. <br />• Kerr-McGee (Anadarko) gas well, associated tank batteries and gas lines located on <br />the subject property. See Map Exhibit C-1. <br />• Excel owns a high voltage power line that crosses the property in an east-west <br />direction. <br />• United Power owns a three-phase power line that is located along the east property <br />line of Morton Lakes (east property line of Holton Lakes). Presently, it is unclear if <br />there is any future need for this line. If it is determined to be of no further use to <br />Holton, or the adjacent property owner, the line will be removed. If the line is in <br />service during mining, the Applicant will seek authorization from United Power to <br />relocate the portion of the line along the west side of Morton Lakes mining Stages 2 <br />and 3. <br />0
The URL can be used to link to this page
Your browser does not support the video tag.