Laserfiche WebLink
• <br />• <br />• <br />13.0 EXHIBIT L - RECLAMATION COSTS <br />The following line items represent the estimated cost to reclaim the Morton Lakes <br />Pit based on a maximum disturbed area of 110 acres. <br />1. Estimated Direct Reclamation Cost: <br />• Backfill Slopes <br />• Topsoil Disturbed Areas <br />• Scarify Soil (60 acres) <br />• Grass Seed Mix (60 acres) <br />• Drill Grass Seed (60 acres) <br />• Weed Control (60 acres) <br />• Field Conveyor Removal <br />• Demo and Salvage <br />Unit Cost Total Cost <br />$ 0.75/LCY $ 250,000.00 <br />$ 0.75/LCY 15,000.00 <br />$ 30.00/Acre 1,800.00 <br />$ 40.00/Acre 2,400.00 <br />$18.00/Acre 1,080.00 <br />$18.00/Acre 1,080.00 <br />$15.00/ft. 37,500.00 <br />$25,000.00 110,000.00 <br />• Total Direct Reclamation Cost <br />2. Indirect Cost: <br />• Contractor Profit <br />• DRM&S Administrative Expense <br />• Liability Insurance <br />• Performance Bond <br />• Total Indirect Cost <br />3. Total Reclamation Bond Amount <br />$ 418,860.00 <br />10% of direct cost $ 41,900.00 <br />5% of direct cost 21,000.00 <br />2% of direct cost 8,400.00 <br />1% of direct cost 4,200.00 <br />$ 75,500.00 <br />$ 494,400.00 <br />1