Laserfiche WebLink
• 5.5 Disturbance Areas <br />Disturbance areas associated with the Morton Lakes Pit are estimated as follows: <br />Mining Area Acres <br />Stage 1 17.0 <br />Stage 2 21.6 <br />Stage 3 36.4 <br />Stage 4 37.3 <br />Stage 5 19.3 <br />Total Project Disturbance 131.6 <br />Total Permit Area 180.0 <br />The maximum area that will be disturbed at an y point during the operation will be <br />approximately 55 acres. <br /> <br />r] <br />3