Laserfiche WebLink
-5- <br />14. On Site Processing: <br />X Solution (SO) _ Chemical (CH) __ Thermal (TH) <br />__ Heap Leach (HL) _ Vat Leach (VL) <br />List any designated chemicals or acid-producing materials to be used or stored within permit area: <br />No change from original application <br />Description of Amendment: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s): <br />American Soda is applying to amend its existing permit to remove the <br />following lands and associated infrastructures from the original permitted <br />acreage and reclamation plan and change the post=mining use of 26.1 acres <br />of land from Rangeland to Industrial/Commercial. <br />4 acres located in the SE 1/4 SW 1/4 NE 1/4, 0.8 acres located in the SW1/4 <br />SE1/4 NE1/41 2 acres located in the NW1/4 SE1/4 NE1/4, and 7 acres located <br />in the NE1/4 SW1/4 NE1/4 Section 19, Township 1S, Range 97 West,6th Principle <br />Meridian, Rio Blanco County, Colorado totaling 13.8 acres which comprise the <br />main processing building, control room, administrative offices, maintenance <br />shop, septic leach field, electrical substation and storm water pond. <br />Ownership of these assets has been transfered to EnCa.na Oil and Gas (USA), <br />Inc. and a right of way grant from BLM to EnCana has been issued changing the <br />use of this property from mining to oil and gas production. <br />2.3 acres located in the NW1/4 SE1/4 NE1/4, 3 acres located in the NE1/4 SW1/4 <br />NE1/4, 5 acres located in the SE1/4 NW1/4 NE1/4, and 2 acres located in the <br />SW1/4 NE1/4 NE1/4 Section 192 Township 1S, Range 97 West, 6th Principle <br />Meridian, Rio Blanco County, Colorado, totaling 12.3 acres which comprise the <br />temporary lay down area and parking area as well as the temporary batch plant <br />area, heliport and top soils storage area which have been incorporated as part <br />of a right of way granted by BLM to Enterprise Production Partners for the <br />construction of a natural gas processing plant.