Laserfiche WebLink
Banks and Gesso, LLC <br />. 'r y ... k <br />'ED <br />JAN 2 8 2008 <br />Division of ReW matl0n; <br />January 17, 2008 Mining and Safety <br />Travis Marshall <br />c/o Steve Shuey <br />./'Colorado Division of Reclamation, Mining, and Safety <br />101 South 3rd St., Suite 301 <br />Grand Junction, CO 81501 <br />720 Kipling St., Suite 117 <br />Lakewood, Colorado 80215 <br />(303) 274-4277 <br />Fax (303) 274-8329 <br />www.banksandgesso.com <br />RECEIVED <br />? JAN 2 `; 2008 <br />GRAND JUNC1'10N i=1ELD OFFICE <br />DIVISION OF <br />RECLAMATION MINING & SAFETY <br />Re: Blue Pit, M-1981-207, Technical Revision 7, Request for Extension of TR <br />Decision Date <br />Dear Mr. Marshall: <br />On behalf of our client, Western Slope Aggregates, Inc., Banks and Gesso, LLC, is <br />submitting this request to extend the decision date of the above referenced Technical <br />Revision request until February 8, 2008. <br />At this time, the operator is considering options in regard to stipulating the removal of the <br />concrete plant or a possible amendment, as suggested by the Division, if the operations <br />at the concrete plant outlast the mining operations subsequent to reclamation of the site. <br />We appreciate the. guidance offered by the Division in defining this issue and possible <br />routes to its resolution. It. is :also our intention to develop additional information to <br />respond to the requirements of this office, which may be common to both the inspection <br />report and adequacy letter. <br />It is our hope that this extension of time will be adequate to clarify the request and any <br />information necessary to obtain the Division's approval. <br />Sincerely, <br />BANKS AND GESSO, LLC <br />C?ifZ .4GBx 5?yp T?? <br />Alex Schatz <br />Blue Pit, M-1981-207 <br />Extension of Decision Date