My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-12-11_REVISION - M1997027
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1997027
>
2007-12-11_REVISION - M1997027
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:17:05 PM
Creation date
12/5/2008 12:48:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997027
IBM Index Class Name
REVISION
Doc Date
12/11/2007
Doc Name
Reclamation cost update
From
DRMS
To
A.J. Botti Construction & Gravel
Type & Sequence
AM1
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADJUSTED COSTS Ownership Costs <br /> <br />Depreciation CFC Overhead Overhaul and Operating Costs sheet 2 of 2 <br />Overhaul Field Repair <br />Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br />Acquisition cost : $13.36 NA NA NA NA NA NA NA NA NA NA <br />Econ.life -Dozer and ROPS : $13.36 NA NA $4.33 $8.80 $5.33 $8.53 NA NA NA NA <br />-Attachment no. 2: NA NA NA $0.48 $0.93 $0.80 $1.16 NA NA NA NA <br />Annual usage : $21.96 $10.45 $14.27 NA NA NA NA NA NA NA NA <br />Double shifts : $16.47 $5.23 $7.13 NA NA NA NA NA NA NA NA <br />Triple shifts : $14.65 $3.48 $4.75 NA NA NA NA NA NA NA NA <br />Mechanic labor-Dozer and ROPS : NA NA NA $3.38 NA $4.16 NA NA NA NA NA <br />-Attachment no. 2 : NA NA NA $0.37 NA $0.62 NA NA NA NA NA <br />Fuel/lube -Dozer and ROPS : NA NA NA NA NA NA NA $0.27 $2.24 $0.00 $1.42 <br />Attachment no. 2 : NA NA NA NA NA NA NA $0.00 $0.11 $0.00 $0.97 <br />ADJUSTED COST SUBTOTALS <br /> <br />Depreciation Ownership Costs <br /> <br />CFC <br /> <br />Overhead <br />Overhaul <br />Labor Parts Overhaul and Operating Costs <br />Field Repair <br />Labor Parts Fuel Lube Tires G.E.C. <br />Dozer, ROPS and Attachment no. 2: Dozer and ROPS <br />Single shifts : $21.96 $10.45 $14.27 $3.38 $8.80 $4.16 $8.53 $0.27 $2.24 $0.00 $1.42 <br />Double shifts : $1647 $5.23 $7.13 Ripper : <br />Triple shifts : $14.65 $3.48 $4.75 $0.37 $0.93 $0.62 $1.16 $0.00 $0.11 $0.00 $0.97 <br />HOURLY OPERATOR WAGES Base Fringe F.I.C.A. Unempl. Wk.Comp. Total <br /> Rate Benefits 7.65% 6.20% 9.80% ($/hr) Shift Differential Colorado labor zone : 2 <br />Dozer operator (< 70hp) $20.67 $7.22 $1.58 $1.28 $2.03 $32.78 Day : $0.00 Two shift per day average : $0.15 <br />Dozer operator (-70hp) $20.67 $7.22 $1.58 $1.28 $2.03 $32.78 Swing : $0.30 Three shift per day average : $0.25 <br />Mechanic $20.97 $7.22 $1.60 $1.30 $2.06 $33.15 Night : $0.45 <br />HOURLY EQUIPMENT COST SUMMARY Ownership Operatin <br />Machine g and Overhaul <br />Attachments Operator Total <br />Costlhr ($) <br />Single shifts : $46.68 $28.79 $4.17 $32.78 $112.42 <br />Double shifts : $28.83 $28.79 $4.17 $32.93 $94.72 <br />Triple shifts : $22.88 $28.79 $4.17 $33.03 $88.87 <br />EQUIPMENT SPECIFICATIONS <br />BULLDOZER : Transmission Weight Length Width Height Fuel Horsepower <br />Description Type (UST) (ft.) (ft.) (ft.) type (fhp) <br />Cat D7R DS Series 11- 7SU NA 27.3 19.8 8.3 11.6 diesel 240 <br /> <br />BLADE: Weight Capacity Width Height Travel speeds (mph) : <br />Gear: 1st <br />2nd 3rd <br />Description (UST) (cy) (ft.) (ft.) Forward : 2.3 4.3 6.9 <br />Semi-Universal 4.0 8.98 12.1 5.0 Reverse : 3.0 5.2 8.8 <br />REAR RIPPER: <br />Description Type Weight <br />(UST) No. of <br />shanks Shank <br />spacing (ft) Beam <br />width (ft) Max. rip <br />depth (ft) <br />3-shank ripper Parallelogram 3.9 3 3.2 6.5 2.5 <br />Total machine shipping weight : 35.2 US tons
The URL can be used to link to this page
Your browser does not support the video tag.