My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-12-11_REVISION - M1997027
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1997027
>
2007-12-11_REVISION - M1997027
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:17:05 PM
Creation date
12/5/2008 12:48:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997027
IBM Index Class Name
REVISION
Doc Date
12/11/2007
Doc Name
Reclamation cost update
From
DRMS
To
A.J. Botti Construction & Gravel
Type & Sequence
AM1
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine Total Fleet Size Haul Trip Return Trip <br />Description Cost/hour/unit (No. units) Cost/hr/fleet Cost/hr/fleet <br />Subtotals :1 $0.00 $0.00 <br />EQUIPMENT HAUL DISTANCE and TIME <br />Transportation Cycle Time : Non- <br /> Roadable <br /> Equipment <br />Haul time (hours) = 0.17 <br />Return time (hours) = 0.17 <br />Loading time (hours) = 0.50 <br />Unloading time (hours) = 0.50 <br />Subtotals = 1.33 <br />Nearest major city or town within project area region <br />Total one-way travel distance <br />Roadable Average travel speed <br />Equipment <br />0.17 Total non-roadable mob/demob cost' <br />0.17 * two round trips with haul rig <br />NA Total roadable mob/demob cost ** <br />NA "* one round trip, no haul rig <br />0.33 <br />Delta <br />5.0 miles <br />30.0 mph <br />$283.12 <br />$0.00 <br />JOB TIME AND COST Total job time : 2.67 hours <br />Total job cost : $283
The URL can be used to link to this page
Your browser does not support the video tag.