Laserfiche WebLink
.. <br />ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Water Tanker, 3,500 Gal. $70.07 1 $70.07 $70.07 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $70.07 $70.07 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Delta <br />Transportation Cycle Time : Non- Total one-way travel distance : 5.0 miles <br /> Roadable Roadable Average travel speed : 30.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.17 0.17 Total non-roadable mob/demob cost $1,216.64 <br />Return time (hours) = 0.17 0.17 * two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost ** : $23.36 <br />Unloading time (hours) = 0.50 NA ** one round trip, no haul rig <br />Subtotals = 1.33 0.33 <br />JOB TIME AND COST Total job time : 2.67 hours <br />Total job cost : $1,240