My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-11-20_REVISION - M1981185
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2007-11-20_REVISION - M1981185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:19:07 PM
Creation date
12/4/2008 3:31:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REVISION
Doc Date
11/20/2007
Doc Name
Bond recalculation for permit transfer
From
DRMS
To
Wildcat Mining Corp.
Type & Sequence
SO2
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 104 State : Colorado Permit/job# : M-1981-185 <br />Date <br />User <br />1112012007 <br />RCO <br />County: La Plata Abbreviation :none <br />Site :May Day Mine Filename :M185-104 <br />Agency or organization name: DRMS <br />Permit or other job action : Transfer to Wildcat Mining <br />Task description : Contour fill material against Level 1 portal face <br />. <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D7R DS Series 11 - 7SU Horsepower : 240 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br />Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $48.36 NA <br /> Operating cost/hour : $56.19 100 <br /> Ripper op. cost/hour : $0.54 10 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $137.87 Total fleet cost/hour : $137,87 <br />.. . ,....... <br />MATERIAL QUANTITIES ........... <br />Initial Swell Loose <br />volume : 650 LCY factor : NA volume : 650 LCY <br /> <br />Source of estimated volume :permit plan <br />Source of estimated swell factor : NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> ,Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 1.10 (Cat HB) <br />Unadjusted hourly production : 714.3 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1 shift/day) <br />Partly consolidated stockpile Spoil pile: 0.80 (fnd-ro <br /> Push gradient : 0.79 (Cat HS) <br />Average push gradient : 10.00 % (pos) Altitude : 0.93 (Cat HB) <br />Average site altitude : 9,200 feet Material weight : 0.70 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 3,300 Ibs/LCY Net correction : 0.28 <br />Weight description : <br />Decomposed rock - 75% Rock, 25% Earth Adjusted unit production : 199.48 LCY/hr <br /> Adjusted fleet production : 199.48 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 3.26 Hours <br />Unit cost : $0.691 /LCY Total job cost : $449 <br />
The URL can be used to link to this page
Your browser does not support the video tag.