My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-11-20_REVISION - M1981185
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2007-11-20_REVISION - M1981185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:19:07 PM
Creation date
12/4/2008 3:31:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REVISION
Doc Date
11/20/2007
Doc Name
Bond recalculation for permit transfer
From
DRMS
To
Wildcat Mining Corp.
Type & Sequence
SO2
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name: DRMS <br />Permit or job action : Transfer to Wildcat Mining <br />......... .. .. .. <br />TASK LIST (DIRECT COSTS) <br />NO. TASK DESCRIPTION <br />FORM <br />USED <br />FLEET <br />SIZE ... .. <br />TASK <br />HOURS <br />DIRECT <br />COST <br />101 -Recontour dump - Level 1 excavate 1 4.0 $314 <br />102 -Demolish and dispose of structures (all 3 portal sites) demolish 1 8.0 $37 <br />103 -Backfill adit - Level 1 mineseal 1 2.0 $360 <br />104 -Contour fill material against Level 1 portal face dozer 1 4.0 $449 <br />105 -Noxious weed control treatments (all 3 portal sites) NA 1 10.0 $249 <br />106 -Spread growth medium on graded areas at Level 1 dozer 1 0.5 $69 <br />107 -Revegetate disturbed areas - Level 1 revege 1 8.0 $1,877 <br />201 -Recontour dump - Level 2 excavate 1 4.0 $314 <br />203 -Backfill adit - Level 2 mineseal 1 2.0 $360 <br />204 -Contour fill material against Level 2 portal face dozer 1 4.0 $449 <br />206 -Spread growth medium on graded areas at Level 2 dozer 1 0.5 $69 <br />207 -Revegetate disturbed areas - Level 2 revege 1 8.0 $1,877 <br />301 -Recontour dump - Lamb portal excavate 1 1.5 $121 <br />303 -Backfill adit - Lamb portal mineseal 1 2.0 $360 <br />304 -Contour fill material against Lamb portal face dozer 1 1.5 $173 <br />306 -Spread growth medium on graded areas at Lamb portal dozer 1 0.2 $35 <br />307 -Revegetate disturbed areas - Lamb portal revege 1 6.0 $626 <br />108 -Haul reclamation equipment to and from site mobilize 1 5.2 $1,426 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS : 71.4 $9,165 <br />includes inflation factor adjustment of : NA %o TOTAL DIRECT COST' $9,165 <br />. .. ....... .... ..: <br />.. <br />...... . _ .:........ .. <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - Liability insurance : 2.02 % of direct total = $185 <br />Performance bond : 1.05 % of direct total = $96 <br />Job superintendent : NA NA NA total = NA <br />Profit : 10.00 % of direct total = $916 <br />not required (or eqp. operator serves as super.) TOTAL O & P = $1,198 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT - CONTRACT AMO UNT (direct + O & P) _ $10,363 <br />Financial warranty processing (legal/related costs) : 0.00 total $ NA total $0 <br />Engineering work and/or contract/bid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr. ' NA total = $518 <br />CONTINGENCY - NA- NA total = NA <br />contingencies accounted for at task level TOTAL INDIRECT COST = $1,716 <br />TOTAL BOND AMOUNT (direct + indirect) _ $10,881
The URL can be used to link to this page
Your browser does not support the video tag.