Laserfiche WebLink
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />PROJECT IDENTIFICATION sheet 1 of 2 <br />Agency or organization name: DRMS <br />Task # : 108 State :Colorado Permit/job #:M-1981-185 <br />Date : 11120/2007 , County :La Plata Abbreviation :none <br />User : RCO Site :May Day Mine Filename :M185-108 <br />Permit or other job action : Transfer To Wildcat Mining <br />Task description :Haul reclamation eqc <br />E <br />to and from site <br />QU al" 1 RIG COST Shift basis : 1 per day <br /> Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tra ctor, 6x4, diesel powered, 400 HP (2nd half, 2006 <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat D7R DS Series 11 - 7SU 35.17 $41.70 $117.55 1 $159.25 $117.55 $0.00 <br />-Cat 320C 21.72 $26.76 $88.67 1 $115.43 $88.67 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $274.68 $206.22 $0.00