My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-11-20_REVISION - M1981185
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2007-11-20_REVISION - M1981185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:19:07 PM
Creation date
12/4/2008 3:31:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REVISION
Doc Date
11/20/2007
Doc Name
Bond recalculation for permit transfer
From
DRMS
To
Wildcat Mining Corp.
Type & Sequence
SO2
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />HYDRAULIC EXCAVATOR WORK <br />PROJECT IDENTIFICATION <br />Task #: 201 State :Colorado Permit/job # M-1981-185 <br />Date : 1112012007 County: La Plata Abbreviation :none <br />User : RCO Site : May Day Mine Filename : M185-201 <br />Agency or organization name: DRMS <br />Permit or other job action : Transfer to Wildcat Mining <br />Task description :Recontour dump - Level,2 <br />HOURLY EQUIPMENT COST <br />Machine description : Cat 320C Horsepower : 138 <br /> <br />Cost Breakdown : Utilization % Weight (MT) : 19.70 <br />Ownership cost/hour : $26.76 NA Shift basis: 1 per day <br />Operating cost/hour : $36.66 100 Data source: <br />ource : <br />- (CRG) <br />- <br />Operator cost/hour : $32.96 NA <br />Total unit cost/hour : $96.39 Total fleet cost/hour : $96.39 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 650 CCY factor : 1.215 volume : 790 LCY <br />Source of estimated volume :permit plan <br />Source of estimated swell factor :na <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket swing loaded dump bucket swing empty) <br />Basic job condition description : AVERAGE <br />Secondary job condition within basic description : AVERAGE <br />Cycle time value : <br />Bucket Capacity 0.28 minutes <br />Rated bucket capacity : 1.63 LCY (heaped) Bucket size class : <br />--- <br />- medium <br />Bucket fill factor : <br />6 <br />.97 Sand and gravel (95% - 100916) <br />Adjusted bucket capacity : 1.59 LCY <br />Job Condition Correction Factors <br /> <br />Site altitude : 9,200 feet Altitude adjustment : <br />0.87 Source <br />(Cat HB) <br />Job efficiency adjustment : 0.83 (1 shift/day) <br />Net job correction : 0.72 multiplier <br />Unadjusted hourly unit production : 335.76 LCY/hour <br />Adjusted hourly unit production : 242.45 LCY/hour <br />Adjusted hourly fleet production : 242.45 LCY/hour <br />JOB TIME AND COST - - <br />Fleet size : 1 excavator(s) Total job time : 3.26 h ours <br />Unit cost : $0.398 per LCY Total job cost : $314 <br />
The URL can be used to link to this page
Your browser does not support the video tag.