Laserfiche WebLink
ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Flatbed Truck, 4x2, 30K GVW $58.37 1 $58.37 $58.37 <br />-Light Duty Pickup, 4x4, 314 T. $46.40 1 $46.40 $46.40 <br />-Fuel Tanker, 4x2, 170 HP $63.62 1 $63.62 $63.62 <br />-tube Truck, 4x2, 170 HP $71.52 1 $71.52 $71.52 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $239.91 $239.91 <br />........................:::.....:.:..:.:.::::::.:::.............. <br />::::::: <br />EQUIPMENT HAUL DISTAN ....................................................................................................................................... <br />CE and TIME <br />Nearest major city or town within project area region <br />Transportation Cycle Time : Non- Total one-way travel distance <br />Roadable Roadable Average travel speed <br />Leadville <br />Equipment Equipment <br />Haul time (hours) _ <br />Return time (hours) _ <br />Loading time (hours) _ <br />Unloading time (hours) _ <br />Subtotals = <br />0.17 0.17 <br />0.17 0.17 <br />1.00 NA <br />1.00 NA <br />2.33 0.33 <br />Total non-roadable mob/demob cost * <br />* two round trips with haul rig <br />Total roadable mob/demob cost ** <br />** one round trip, no haul rig <br />JOB TIME AND COST <br />Total job time : <br />Total job cost :