My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-10-14_REVISION - M1995030
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1995030
>
2008-10-14_REVISION - M1995030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:10:21 PM
Creation date
12/4/2008 1:40:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995030
IBM Index Class Name
REVISION
Doc Date
10/14/2008
Doc Name
SO Appl
From
McAtee Construction Company
To
DRMS
Type & Sequence
SO1
Email Name
MET
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-4- <br />IV. RECITALS <br />On June 2 1995 permit Number M1995-030 <br />was granted to <br />Green Bros Inc. (existing operator) ("Permittee"), pursuant to which <br />Permittee has been conducting a mining operation in the County of Morgan , State of Colorado. <br />2. Permittee wishes to assign the permit to . McAtee Construction Company new <br />operator), as Successor Operator ("Successor") and Successor wishes to become Successor Permittee under the <br />permit. <br />3. Successor understands that the reclamation plan (the "Plan") required by the permit and by applicable <br />State laws and regulations has not been completed and is willing to assume full responsibility for the completion of <br />the Plan. <br />V. AGREEMENTS <br />Permittee and Successor hereby agree, for their own benefit and for the benefit of the State, such agreements to be <br />effective ipso facto upon the approval by the State of the transfer of the Permit from Permittee to Successor, as <br />follows: <br />1. Successor has inspected the mining and reclamation operations to its entire satisfaction and is fully aware <br />of the conditions thereof. Successor understands and accepts all of the conditions of the Permit. <br />2. Successor will complete the reclamation plan, and hereby assumes liability for completing such plan as to <br />all areas heretofore disturbed, as well as to all areas hereafter disturbed. Successor will perform all of the <br />obligations of the Pennittee under the Permit which have not heretofore been performed by Permittee. <br />3. Successor hereby tenders to the State its attached Performance and Financial Warranties*, which are to be <br />substituted for the Performance and Financial Warranties heretofore filed by the Permittee, effective upon the <br />release of the latter Warranties. <br />4. Successor represents to the State that, to the best of its knowledge, information and belief, it is not in <br />?liolation of any c fthe provisions of the, Colorado Mined Land mclamation Act with respect to any other operation <br />conducted by it in the State of Colorado. <br />NrmIttee an 3 Successor 4t roby requeq the Stan;, to t msent to the a ig?artcYt c+f'the Per nlit, to rep: og67 Successor <br />as Successor Omrator under the Perin t, and to accept the tendered sut)sr"fe Performance and Finatrcial <br />Warranties in place of the Warranties- presently on tale with the State.
The URL can be used to link to this page
Your browser does not support the video tag.