Laserfiche WebLink
RULE 4 PERFORMANCE STANDARDS <br />4.16 Postmining Land Use <br />4.16.1 General <br />Implementation of the detailed reclamation plan as presented in Section 2.05.5 will result in a landscape <br />and vegetative cover that is equal to or better than the premining condition for rangeland use that <br />currently exists in the area. <br />4.16.2 Determining Use of Land <br />The premining land uses for the mine plan and adjacent areas are shown on the Land Use Map (Map 17). <br />The narrative describing the land use of the permit area is presented under Section 2.04.3. The proposed <br />postmining land use will involve the restoration of the premining land use of rangeland, as described in <br />Section 2.05.5. <br />4.16.3 Prior to Release of Lands from the Permit Area in Accordance with 3.03.1 (2) (c) <br />The land use of rangeland will be restored in a timely manner as outlined in Section 2.05.4. <br />Implementation of the timetables contained therein will assure a contemporaneous reclamation program. <br />No alternative land uses will be implemented in the reclamation plan set forth under Section 2.05.4. <br />Rule 4 Performance Standards 4.16-1 Revision Date: 6/23/08 <br />Revision No.: MR-91