My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-09-29_PERMIT FILE - C1981019A (12)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019A
>
2008-09-29_PERMIT FILE - C1981019A (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:36:41 PM
Creation date
12/2/2008 4:13:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
9/29/2008
Section_Exhibit Name
4.14 Backfilling and Grading
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 4 PERFORMANCE STANDARDS <br />4.14 Backfilling and Grading <br />4.14.1 General Requirements <br />The mining operations of Colowyo will not employ the use of contour mining methods. <br />The following sample of calculations show that Colowyo does not have thin or thick overburden as <br />defined in Subsection 4.14.4 or Subsection 4.14.5. These calculations represent the approximate <br />conditions found in the field and show that there is always more than enough overburden to reestablish <br />the original elevation. As explained in the 1983 Annual Report, Colowyo currently uses an average 20% <br />swell factor for planning purposes. Dragline swell is estimated to be 23%, and truck/shovel swell is <br />estimated to be 17%. Approximately 45% of the overburden is removed by dragline, and 55% by <br />truck/shovel. Since all mining at Colowyo was conducted by truck/shovel methods through 1979, the <br />life-of-mine swell factor has continued to increase. <br />Example: 363 feet overburden, 47 feet coal, (these conditions are found along the western edge of the pit <br />in 1988), 20% swell factor <br />363 feet+ 20% swell = final thickness = 1.06 <br />363 feet+ 47 feet initial thickness <br />Example: 356 feet overburden, 49 feet coal (these conditions are found along the western edge of the pit <br />in (1988), 20% swell factor <br />356 feet+ 20% swell = final thickness = 1.05 <br />363 feet+ 49 feet initial thickness <br />The original permit application utilized at 17% swell factor to project the anticipated postmining <br />topography. <br />During the initial permit review process the anticipated swell factor was subsequently revised to 23% to <br />ensure that the Streeter Fill volume was adequate to allow for sufficient pit development. At that time, <br />excess swell was anticipated to raise the elevation of the postmining topography by about 5.3 feet, <br />compared to the premining topography. As explained above, in 1984, as part of the 1983 Annual Report, <br />Colowyo further refined its estimates based on measurements to date, and currently uses an overall 20% <br />swell factor for estimating purposes. As indicated in the Annual Reports, the stripping accomplished by <br />draglines can vary from 40% to 45% and from 55% to 60% for truck/shovel. Swell factor will continue to <br />be monitored and the postmining topography adjusted, if necessary. Any adjustments will be minor, will <br />be done gradually and will not affect the reclamation plan or postmining land use. Particularly, drainage <br />channel gradients will not be changed; an entire drainage channel elevation could possibly be revised, but <br />the gradient would remain as designed. If a change would be necessary, the dump plan elevations would <br />be revised as appropriate. <br />In order to verify accuracy of the overburden swell factor predictions and postmining topography <br />projections in the initial permit term, Colowyo has committed to the following requirements: <br />"The applicant has committed, within the application to monitor the topographic configuration of <br />the pit and the postmining reclaimed surface of the mined area, in order to verify the accuracy of <br />the overburden swell factor and postmining topography projections. As specifie4d in the <br />application, monitoring for these purposes shall consist of annual survey, utilizing field survey or <br />aerophotogrammetric methods approved by the Division. Using maps depicting the annual <br />Rule 4 Performance Standards 4.14-1 Revision Date: 6/23/08 <br />Revision No.: MR-91
The URL can be used to link to this page
Your browser does not support the video tag.