My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-09-29_PERMIT FILE - C1981019A (11)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2008-09-29_PERMIT FILE - C1981019A (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2017 7:46:23 AM
Creation date
12/2/2008 4:13:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
9/29/2008
Section_Exhibit Name
4.08 Use of Explosives
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 4 PERFORMANCE STANDARDS <br />Colowyo will conduct blasting to prevent injury to persons and damage to public or private property <br />outside the permit area. Colowyo will insure that the maximum peak particle velocity will not exceed the <br />criteria as prescribed by utilizing the equation found in Rule 4.08.4(10) (b) (i) when conducting blasting <br />operations that could affect any dwelling, public building, school, church, or commercial or institutional <br />building. As shown in the Blasting Analysis Map (Map 26) Colowyo has determined the maximum <br />pounds of explosives per 8ms period of time for variable distance from any such structures. <br />The number of blast holes detonated per 8ms period will be calculated according to the equation in Rule <br />4.08.4(10)(c)(i) in order to determine the maximum weight of explosive that can be detonated within any <br />eight ms period. <br />4.08.5 Records of Surface Blasting Activities <br />Colowyo will record all blasts including coal, overburden, and overburden pre-split blasts in a format as <br />shown in Section 2.05, Figure 2.05-2, Blasting Report, which conforms to the requirements of 4.08.5. <br />Conducting blasting operations in accordance with the equation in 4.08.4(10)(c)(i) deems peak particle <br />velocities from blasting to be within the regulatory limits described in 4.08.4(10). Periodic airblast <br />monitoring occurs at Colowyo. The monitor is located along Moffat County Highway 13 at the <br />Durham/Ott Ranch. Records of airblast monitoring described on page 2.05-30 will contain the <br />information required by Rule 4.08.5(17). This information will include either a recording of the <br />calibration signal of the monitoring instrument's gain setting at the time of each blast, or certifications of <br />the instrument's annual calibration. <br />4.08.6 Seismographic Measurements <br />Colowyo will use the explosives equation found in Subsection 4.08.4 (10)(b)(i) to limit the number of <br />blast holes per 8ms period of time such that the peak particle velocity limit of one inch per second will not <br />be exceeded. <br />On June 19 and 20, 1979 initial seismic monitoring of shots at the Colowyo operation was conducted. The <br />results of this seismographic work are set forth in Exhibit 14, Seismographic Measurements. <br />Rule 4 Performance Standards 4.08-4 Revision Date: 6/23/08 <br />Revision No.: MR-91
The URL can be used to link to this page
Your browser does not support the video tag.